Construction method of cast-in-situ bored pile in soft soil foundation
The invention discloses a construction method of a cast-in-situ bored pile in a soft soil foundation. The construction method comprises the following steps of determining a preset area of a target cast-in-situ bored pile according to a construction drawing; arranging a plurality of cement-soil mixing piles along the edge of the preset area, and sequentially connecting the plurality of cement-soil mixing piles so as to form a mixing pile enclosure wall with one side closed; enabling the cement-soil mixing piles to penetrate through the soft soil foundation; embedding a pile casing, wherein the axis of the pile casing coincides with the axis of the preset area; drilling along the pile casing so as to form a pile hole in the preset area after the mixing pile enclosure wall reaches the expected strength; cleaning the hole: cleaning sediment in the pile hole; and placing a reinforcement cage in the pile hole, and pouring concrete into the pile hole. According to the construction method, the problems of hole collapse and hole channeling of the cast-in-situ bored pile in a silt layer and a sand layer can be solved.
本发明公开了一种软土地基钻孔灌注桩施工方法,包括如下步骤:根据施工图纸确定目标钻孔灌注桩的预设区域;沿所述预设区域的边缘设置多个水泥土搅拌桩,所述多个水泥土搅拌桩依次相连以形成一侧向封闭的搅拌桩围护墙;所述水泥土搅拌桩贯穿软土地基;埋设护筒,所述护筒的轴线与所述预设区域的轴线重合;在所述搅拌桩围护墙达到预期强度后,沿所述护筒钻进以于所述预设区域形成桩孔;清孔,清理所述桩孔内的沉渣;以及在所述桩孔内安放钢筋笼并灌注混凝土。本发明可以解决钻孔灌注桩在淤泥层及砂层出现塌孔、窜孔的问题。
Construction method of cast-in-situ bored pile in soft soil foundation
The invention discloses a construction method of a cast-in-situ bored pile in a soft soil foundation. The construction method comprises the following steps of determining a preset area of a target cast-in-situ bored pile according to a construction drawing; arranging a plurality of cement-soil mixing piles along the edge of the preset area, and sequentially connecting the plurality of cement-soil mixing piles so as to form a mixing pile enclosure wall with one side closed; enabling the cement-soil mixing piles to penetrate through the soft soil foundation; embedding a pile casing, wherein the axis of the pile casing coincides with the axis of the preset area; drilling along the pile casing so as to form a pile hole in the preset area after the mixing pile enclosure wall reaches the expected strength; cleaning the hole: cleaning sediment in the pile hole; and placing a reinforcement cage in the pile hole, and pouring concrete into the pile hole. According to the construction method, the problems of hole collapse and hole channeling of the cast-in-situ bored pile in a silt layer and a sand layer can be solved.
本发明公开了一种软土地基钻孔灌注桩施工方法,包括如下步骤:根据施工图纸确定目标钻孔灌注桩的预设区域;沿所述预设区域的边缘设置多个水泥土搅拌桩,所述多个水泥土搅拌桩依次相连以形成一侧向封闭的搅拌桩围护墙;所述水泥土搅拌桩贯穿软土地基;埋设护筒,所述护筒的轴线与所述预设区域的轴线重合;在所述搅拌桩围护墙达到预期强度后,沿所述护筒钻进以于所述预设区域形成桩孔;清孔,清理所述桩孔内的沉渣;以及在所述桩孔内安放钢筋笼并灌注混凝土。本发明可以解决钻孔灌注桩在淤泥层及砂层出现塌孔、窜孔的问题。
Construction method of cast-in-situ bored pile in soft soil foundation
软土地基钻孔灌注桩施工方法
YAO FENGJIE (Autor:in) / WANG QINGZHU (Autor:in) / HOU XIANWEI (Autor:in) / PENG FA (Autor:in) / XIA LEI (Autor:in)
24.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cast-in-situ bored pile foundation construction method
Europäisches Patentamt | 2021
|Soft soil stratum cast-in-situ bored pile construction device
Europäisches Patentamt | 2024
|Pile foundation construction process of cast-in-situ bored pile
Europäisches Patentamt | 2024
|Pile foundation construction process of cast-in-situ bored pile
Europäisches Patentamt | 2023
|