Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reinforcing device in advanced construction process of core tube
The invention relates to the technical field of building construction, in particular to a reinforcing device in an advanced construction process of a core tube. An outer clamping assembly drives a template clamping block to vertically move and locks the bottom of the template clamping block, an inner limiting sliding block slides on an inner guide rail, an inner clamping block locking piece is fixedly mounted on the inner limiting sliding block. The inner clamping block locking piece clamps the end of the template clamping block, a supporting piece vertically slides on the inner guide rail, a certain distance exists between the supporting piece and the inner limiting sliding block. According to the reinforcing device in the advanced construction process of the core tube, a clamping block lifting assembly reduces or increases the distance between the inner limiting sliding block and the supporting piece, and therefore the template clamping block is driven to move up and down. The inner limiting sliding block and an inner sliding block are sequentially locked and unlocked, so that the template clamping block is driven to move upwards, the template clamping block does not need to be disassembled and then assembled, and the construction efficiency of the core tube is improved.
本发明涉及建筑施工技术领域,具体涉及一种核心筒超前施工工艺中加固装置,通过外夹持组件带动模板夹块竖向移动,并对模板夹块的底部进行锁紧,内限位滑块在内导轨上滑动,内限位滑块上固定安装有内夹块锁紧件,内夹块锁紧件对模板夹块的端部进行夹持,支撑件在内导轨上进行竖向滑动,并且与内限位滑块之间存在一定的距离,夹块提升组件减小或增大内限位滑块和支撑件之间的距离,从而实现带动模板夹块上下移动,通过依次对内限位滑块和内滑块进行依次锁紧、解开锁紧,从而实现带动模板夹块向上移动,从而无需对模板夹块进行拆除后再进行组装,进而提升了核心筒的施工效率。
Reinforcing device in advanced construction process of core tube
The invention relates to the technical field of building construction, in particular to a reinforcing device in an advanced construction process of a core tube. An outer clamping assembly drives a template clamping block to vertically move and locks the bottom of the template clamping block, an inner limiting sliding block slides on an inner guide rail, an inner clamping block locking piece is fixedly mounted on the inner limiting sliding block. The inner clamping block locking piece clamps the end of the template clamping block, a supporting piece vertically slides on the inner guide rail, a certain distance exists between the supporting piece and the inner limiting sliding block. According to the reinforcing device in the advanced construction process of the core tube, a clamping block lifting assembly reduces or increases the distance between the inner limiting sliding block and the supporting piece, and therefore the template clamping block is driven to move up and down. The inner limiting sliding block and an inner sliding block are sequentially locked and unlocked, so that the template clamping block is driven to move upwards, the template clamping block does not need to be disassembled and then assembled, and the construction efficiency of the core tube is improved.
本发明涉及建筑施工技术领域,具体涉及一种核心筒超前施工工艺中加固装置,通过外夹持组件带动模板夹块竖向移动,并对模板夹块的底部进行锁紧,内限位滑块在内导轨上滑动,内限位滑块上固定安装有内夹块锁紧件,内夹块锁紧件对模板夹块的端部进行夹持,支撑件在内导轨上进行竖向滑动,并且与内限位滑块之间存在一定的距离,夹块提升组件减小或增大内限位滑块和支撑件之间的距离,从而实现带动模板夹块上下移动,通过依次对内限位滑块和内滑块进行依次锁紧、解开锁紧,从而实现带动模板夹块向上移动,从而无需对模板夹块进行拆除后再进行组装,进而提升了核心筒的施工效率。
Reinforcing device in advanced construction process of core tube
核心筒超前施工工艺中加固装置
LI YONG (Autor:in) / QIAN YUANHAO (Autor:in)
24.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Temporary reinforcing equipment for advanced construction core tube
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|High slope capillary tube reinforcing construction method
Europäisches Patentamt | 2023
|Ceramic core room temperature reinforcing agent and reinforcing process
Europäisches Patentamt | 2022
|Building template reinforcing construction device and process
Europäisches Patentamt | 2024
|