Construction method of T-beam flange cross slope adjustable movable formwork
The invention relates to the technical field of bridge section construction and particularly relates to a T-beam flange cross slope adjustable movable formwork construction method. The method comprises the following steps that firstly, a supporting system is designed, a side span cast-in-place section and a closure section are subjected to a two-time pouring forming process, a side span is poured firstly, and a hanging basket is adopted as a construction support for construction; secondly, the hanging basket is constructed in a walking mode, and after the last cantilever section is poured and prestress tensioning construction is completed, an operation platform at a front cross beam at the bottom of the hanging basket is dismantled; thirdly, beam section construction is conducted, and square timber and thick bamboo plywood are adopted for a pier top bottom die to form a bottom die system; the side mold adopts a hanging basket side shaping steel mold; after binding of beam body bottom plates and wall body steel bars and installation of prestressed pipelines are completed, an inner mold is started to be assembled; and fourthly, counterweight construction is conducted, the needed counterweight weight is obtained according to a moment balance formula, and stress balance of the two ends of the T-shaped structure is kept in the ballasting construction. By means of the method, a problem that in the bridge construction process in winter, mounting and dismounting risks are caused by a traditional bracket is solved.
本发明涉及桥梁节段施工技术领域,具体涉及一种T梁翼缘横坡可调节式活动模板施工方法,包括以下步骤:步骤一、支撑体系设计,边跨现浇段与合龙段采用两次浇筑成型工艺,先浇筑边跨,采用挂篮做施工支架进行施工;步骤二、挂篮走行施工,在浇筑完最后一个悬臂节段后,预应力张拉施工完成后拆除挂篮底部前横梁处作业平台;步骤三、梁段施工,墩顶底模采用方木和厚竹胶板组成底模系统;侧模采用挂篮侧面定型钢模;梁体底板及墙身钢筋绑扎及预应力管道安装完毕后开始拼装内模;步骤四、配重施工,根据力矩平衡公式得出所需配重重量,压重施工中保持T构两端受力平衡。通过该方法解决了冬季桥梁施工过程中,因传统托架安装拆卸风险问题。
Construction method of T-beam flange cross slope adjustable movable formwork
The invention relates to the technical field of bridge section construction and particularly relates to a T-beam flange cross slope adjustable movable formwork construction method. The method comprises the following steps that firstly, a supporting system is designed, a side span cast-in-place section and a closure section are subjected to a two-time pouring forming process, a side span is poured firstly, and a hanging basket is adopted as a construction support for construction; secondly, the hanging basket is constructed in a walking mode, and after the last cantilever section is poured and prestress tensioning construction is completed, an operation platform at a front cross beam at the bottom of the hanging basket is dismantled; thirdly, beam section construction is conducted, and square timber and thick bamboo plywood are adopted for a pier top bottom die to form a bottom die system; the side mold adopts a hanging basket side shaping steel mold; after binding of beam body bottom plates and wall body steel bars and installation of prestressed pipelines are completed, an inner mold is started to be assembled; and fourthly, counterweight construction is conducted, the needed counterweight weight is obtained according to a moment balance formula, and stress balance of the two ends of the T-shaped structure is kept in the ballasting construction. By means of the method, a problem that in the bridge construction process in winter, mounting and dismounting risks are caused by a traditional bracket is solved.
本发明涉及桥梁节段施工技术领域,具体涉及一种T梁翼缘横坡可调节式活动模板施工方法,包括以下步骤:步骤一、支撑体系设计,边跨现浇段与合龙段采用两次浇筑成型工艺,先浇筑边跨,采用挂篮做施工支架进行施工;步骤二、挂篮走行施工,在浇筑完最后一个悬臂节段后,预应力张拉施工完成后拆除挂篮底部前横梁处作业平台;步骤三、梁段施工,墩顶底模采用方木和厚竹胶板组成底模系统;侧模采用挂篮侧面定型钢模;梁体底板及墙身钢筋绑扎及预应力管道安装完毕后开始拼装内模;步骤四、配重施工,根据力矩平衡公式得出所需配重重量,压重施工中保持T构两端受力平衡。通过该方法解决了冬季桥梁施工过程中,因传统托架安装拆卸风险问题。
Construction method of T-beam flange cross slope adjustable movable formwork
一种T梁翼缘横坡可调节式活动模板施工方法
YE YE (Autor:in) / ZHANG ZHANG (Autor:in) / XU PENGJIE (Autor:in) / LI JIALONG (Autor:in) / WANG HAO (Autor:in) / CHEN YONG (Autor:in) / XUE SHUN (Autor:in) / FAN HAIJUN (Autor:in) / XIA XI (Autor:in) / LI CHUNYANG (Autor:in)
28.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Beam body formwork with adjustable flange toothed plates
Europäisches Patentamt | 2021
|Suspended cast beam steel formwork system with adjustable cross slope
Europäisches Patentamt | 2020
|Movable formwork cast-in-place beam end sealing adjustable formwork and end sealing method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Movable formwork assembly and building formwork construction method
Europäisches Patentamt | 2021
|