The invention discloses a supporting assembly and method for pile repairing. The supporting assembly comprises a plurality of main beams, a plurality of secondary beams, flat plates and A-shaped supports, the multiple main beams are arranged on a first concrete supporting beam in parallel, the secondary beams are arranged between every two adjacent main beams, the flat plates are laid above the main beams, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and a second concrete supporting beam. The method comprises the following steps that S1, surveying and setting out are carried out; S2, a pile casing is buried; S3, the main beams are placed, and the main beams are arranged on the first concrete supporting beam in parallel; S4, the secondary beams and the flat plates are placed, the secondary beams are arranged between the two adjacent main beams, and the flat plates are laid on the main beams; S5, the A-shaped supports are installed, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and the second concrete supporting beam; and S6, pile repairing operation is carried out on the flat plates.
本发明公开一种用于补桩的支撑组件及方法,支撑组件包括主梁、次梁、平板和A字撑,主梁和次梁均有多个,多个主梁平行设置于第一道砼支撑梁上,次梁设置于相邻2个主梁之间,平板铺设在主梁的上方,A字撑的两端分别连接第一道砼支撑梁和第二道砼支撑梁;方法包括以下步骤:S1、测量放线;S2、埋设护筒;S3、放置主梁,将主梁平行设置于第一道砼支撑梁上;S4、放置次梁及平板,将次梁设置于相邻2个主梁之间,将平板铺设在主梁的上方;S5、安装A字撑,将A字撑的两端分别连接第一道砼支撑梁和第二道砼支撑梁;S6、在平板上进行补桩作业;本发明提供了一种便于补桩作业的支撑组件及方法。
The invention discloses a supporting assembly and method for pile repairing. The supporting assembly comprises a plurality of main beams, a plurality of secondary beams, flat plates and A-shaped supports, the multiple main beams are arranged on a first concrete supporting beam in parallel, the secondary beams are arranged between every two adjacent main beams, the flat plates are laid above the main beams, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and a second concrete supporting beam. The method comprises the following steps that S1, surveying and setting out are carried out; S2, a pile casing is buried; S3, the main beams are placed, and the main beams are arranged on the first concrete supporting beam in parallel; S4, the secondary beams and the flat plates are placed, the secondary beams are arranged between the two adjacent main beams, and the flat plates are laid on the main beams; S5, the A-shaped supports are installed, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and the second concrete supporting beam; and S6, pile repairing operation is carried out on the flat plates.
本发明公开一种用于补桩的支撑组件及方法,支撑组件包括主梁、次梁、平板和A字撑,主梁和次梁均有多个,多个主梁平行设置于第一道砼支撑梁上,次梁设置于相邻2个主梁之间,平板铺设在主梁的上方,A字撑的两端分别连接第一道砼支撑梁和第二道砼支撑梁;方法包括以下步骤:S1、测量放线;S2、埋设护筒;S3、放置主梁,将主梁平行设置于第一道砼支撑梁上;S4、放置次梁及平板,将次梁设置于相邻2个主梁之间,将平板铺设在主梁的上方;S5、安装A字撑,将A字撑的两端分别连接第一道砼支撑梁和第二道砼支撑梁;S6、在平板上进行补桩作业;本发明提供了一种便于补桩作业的支撑组件及方法。
Repairing structure and repairing construction method for foundation pit supporting pile
Europäisches Patentamt | 2020
|Pile repairing structure and pile repairing method for few-pile position of engineering pile
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Supporting row pile energy-saving repairing structure and construction method thereof
Europäisches Patentamt | 2021
|