Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integral biochemical pool initiation seam construction method
The invention belongs to the technical field of water supply and drainage engineering, and particularly relates to an integral biochemical pool initiation seam construction method. The integral biochemical pool initiation seam construction method comprises the following steps of (1) respectively arranging an EP type rubber waterstop which continuously passes through an initiation seam and a continuous reinforcing steel bar on the inner side of the initiation seam outwards, and arranging a plastic sleeve at the through part of the seam; (2) arranging a discontinuous reinforcing steel bar on the outer side of the continuous steel bar, and fixing a CB type rubber waterstop to the discontinuous reinforcing steel bar through a supporting frame; (3) embedding a sealing strip extruded in a concrete body in a joint on the outer side of the initiation seam, and filling the surface of the sealing strip with polysulfide sealant; and (4) pouring concrete according to design requirements, and removing necessary formworks after the concrete is solidified. According to the integral biochemical pool initiation seam construction method, the construction of the initiation seam of a biochemical pool is facilitated, the release of internal stress of the structure can be achieved, the requirement for structural deformation within a continuous section of length can be met, and thermal expansion and cold contraction deformation of a concrete member due to foundation deformation or temperature can be adapted.
本发明属于给排水工程技术领域,具体涉及一种整体式生化池引发缝施工方法,包括以下步骤:(1)在引发缝处内侧向外分别设置连续通过引发缝的EP型橡胶止水带和连续的钢筋,缝贯通部分设置有塑料套管;(2)连续的钢筋外侧设置间断的钢筋,间断的钢筋处通过支撑架固定CB型橡胶止水带;(3)引发缝外侧接缝处嵌入挤压在混凝土本体中的密封条,密封条表面填聚硫密封膏;(4)根据设计要求进行混凝土浇筑,混凝土凝固后拆除必要的模板。本发明便于生化池引发缝处的施工,能够实现结构内应力的释放,可满足连续一段长度内的结构变形需要以及能够适应地基变形或者温度引起混凝土构件热胀冷缩变形。
Integral biochemical pool initiation seam construction method
The invention belongs to the technical field of water supply and drainage engineering, and particularly relates to an integral biochemical pool initiation seam construction method. The integral biochemical pool initiation seam construction method comprises the following steps of (1) respectively arranging an EP type rubber waterstop which continuously passes through an initiation seam and a continuous reinforcing steel bar on the inner side of the initiation seam outwards, and arranging a plastic sleeve at the through part of the seam; (2) arranging a discontinuous reinforcing steel bar on the outer side of the continuous steel bar, and fixing a CB type rubber waterstop to the discontinuous reinforcing steel bar through a supporting frame; (3) embedding a sealing strip extruded in a concrete body in a joint on the outer side of the initiation seam, and filling the surface of the sealing strip with polysulfide sealant; and (4) pouring concrete according to design requirements, and removing necessary formworks after the concrete is solidified. According to the integral biochemical pool initiation seam construction method, the construction of the initiation seam of a biochemical pool is facilitated, the release of internal stress of the structure can be achieved, the requirement for structural deformation within a continuous section of length can be met, and thermal expansion and cold contraction deformation of a concrete member due to foundation deformation or temperature can be adapted.
本发明属于给排水工程技术领域,具体涉及一种整体式生化池引发缝施工方法,包括以下步骤:(1)在引发缝处内侧向外分别设置连续通过引发缝的EP型橡胶止水带和连续的钢筋,缝贯通部分设置有塑料套管;(2)连续的钢筋外侧设置间断的钢筋,间断的钢筋处通过支撑架固定CB型橡胶止水带;(3)引发缝外侧接缝处嵌入挤压在混凝土本体中的密封条,密封条表面填聚硫密封膏;(4)根据设计要求进行混凝土浇筑,混凝土凝固后拆除必要的模板。本发明便于生化池引发缝处的施工,能够实现结构内应力的释放,可满足连续一段长度内的结构变形需要以及能够适应地基变形或者温度引起混凝土构件热胀冷缩变形。
Integral biochemical pool initiation seam construction method
一种整体式生化池引发缝施工方法
FAN JIA (Autor:in) / ZHOU XINGGUI (Autor:in) / SUN XIONG (Autor:in) / ZHOU HONGGUANG (Autor:in) / LI XIANGYANG (Autor:in)
31.12.2021
Patent
Elektronische Ressource
Chinesisch
Overhead pool bottom plate initiation seam construction method
Europäisches Patentamt | 2023
|Super-long pool structure initiation seam construction structure and method
Europäisches Patentamt | 2022
|Construction method of super-long seam-free pool and rolling support of super-long seam-free pool
Europäisches Patentamt | 2024
|Fabricated floor slab integral type abutted seam construction method and floor slab
Europäisches Patentamt | 2022
|