Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway pavement repairing structure and repairing method thereof
The invention discloses a highway pavement repairing structure which comprises a support, a shoveling component and a repairing component, the shoveling component and the repairing component are both located on the support, the shoveling component comprises a first crushing part, a second crushing part, a connecting rod and a driving assembly used for driving the connecting rod to move, and the second crushing part is located on the first crushing part. The first crushing part is located on the connecting rod, and the connecting rod is rotationally connected with the support and is hollow. According to the highway pavement repairing structure, through the second crushing part, the repairing position of the original pavement can be conveniently subjected to reaming, the contact area of the repairing position and the original pavement is increased, then the connecting tightness of the repairing pavement and the original pavement is improved, the stability of the repairing pavement is improved, and the service life of the repairing pavement is prolonged.
本发明公开了一种公路路面修复结构,包括支架、铲除构件以及修复构件,铲除构件和修复构件均位于支架上,铲除构件包括第一破碎件、第二破碎件、连接杆以及用于驱动连接杆运动的驱动组件,第二破碎件位于第一破碎件上,第一破碎件位于连接杆上,连接杆与支架转动连接,连接杆中空设置。本发明的公路路面修复结构,通过第二破碎件,便于对原路面的修复位置进行扩孔,增加修复位置与原路面的接触面积,进而提高修复路面与原路面连接的紧密性,提高修复路面的稳定性,延长修复路面的使用寿命。
Highway pavement repairing structure and repairing method thereof
The invention discloses a highway pavement repairing structure which comprises a support, a shoveling component and a repairing component, the shoveling component and the repairing component are both located on the support, the shoveling component comprises a first crushing part, a second crushing part, a connecting rod and a driving assembly used for driving the connecting rod to move, and the second crushing part is located on the first crushing part. The first crushing part is located on the connecting rod, and the connecting rod is rotationally connected with the support and is hollow. According to the highway pavement repairing structure, through the second crushing part, the repairing position of the original pavement can be conveniently subjected to reaming, the contact area of the repairing position and the original pavement is increased, then the connecting tightness of the repairing pavement and the original pavement is improved, the stability of the repairing pavement is improved, and the service life of the repairing pavement is prolonged.
本发明公开了一种公路路面修复结构,包括支架、铲除构件以及修复构件,铲除构件和修复构件均位于支架上,铲除构件包括第一破碎件、第二破碎件、连接杆以及用于驱动连接杆运动的驱动组件,第二破碎件位于第一破碎件上,第一破碎件位于连接杆上,连接杆与支架转动连接,连接杆中空设置。本发明的公路路面修复结构,通过第二破碎件,便于对原路面的修复位置进行扩孔,增加修复位置与原路面的接触面积,进而提高修复路面与原路面连接的紧密性,提高修复路面的稳定性,延长修复路面的使用寿命。
Highway pavement repairing structure and repairing method thereof
一种公路路面修复结构及其修复方法
JIANG GONGCHAO (Autor:in) / ZHANG HONGMEI (Autor:in) / LIU XINYU (Autor:in) / LIU YUANYUAN (Autor:in) / ZHANG SHURU (Autor:in)
14.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Highway pavement repairing equipment and repairing method thereof
Europäisches Patentamt | 2024
|Highway pavement structure and repairing method thereof
Europäisches Patentamt | 2022
|Highway pavement crack repairing device and repairing method
Europäisches Patentamt | 2024
|Pavement repairing device for highway bridge construction and repairing method thereof
Europäisches Patentamt | 2021
|