Hoisting construction method for pipe gallery steel members
The invention discloses a hoisting construction method for pipe gallery steel members. The hoisting construction method comprises the following operation steps of S1, preparation before hoisting, specifically, the steel members being transported, packaged, transported, loaded, unloaded and stacked; S2, the steel members entering a field for inspection, measurement and reinspection; S3, performing steel structure mounting preparation work, specifically, construction site preparation; equipment selection; S4, performing basic steps of steel structure hoisting and hoisting, specifically, trial hoisting and hoisting in place; and S5, steel platform hoisting, and performing mounting and welding on site, specifically, selecting a welding method, selecting a welding material, storing and keeping the welding material, generally stipulating about welding, checking before welding, cleaning before welding, positioned welding, welding a run-on plate, a lead-out plate and a welding lining plate, and meeting the requirements of double-groove full penetration back gouging. The hoisting construction method has the advantages that potential safety hazards are reduced, the labor cost is reduced, and the mounting efficiency, rigidity and construction progress of the steel members are improved.
本发明公开了一种管廊钢构件吊装施工方法,包括以下操作步骤:S1:吊装前准备:钢构件运输、包装、运输、装卸、堆放;S2:钢构件进场检验、测量、复验;S3:钢结构安装准备工作:施工现场准备;设备的选用;S4:钢结构吊装,吊运基本步骤:试吊、吊运就位;S5:钢平台吊装,现场安装焊接;焊接方法的选择、焊接材料的选择、焊接材料的储存保管、焊接一般规定、焊前检查、焊前清理、定位焊、焊接引弧板、引出板和焊接衬板要求同制作、双面坡口全熔透清根要求;本发明具有降低了安全隐患,降低了人工成本,提高了钢构件的安装效率、刚性和施工进度的优点。
Hoisting construction method for pipe gallery steel members
The invention discloses a hoisting construction method for pipe gallery steel members. The hoisting construction method comprises the following operation steps of S1, preparation before hoisting, specifically, the steel members being transported, packaged, transported, loaded, unloaded and stacked; S2, the steel members entering a field for inspection, measurement and reinspection; S3, performing steel structure mounting preparation work, specifically, construction site preparation; equipment selection; S4, performing basic steps of steel structure hoisting and hoisting, specifically, trial hoisting and hoisting in place; and S5, steel platform hoisting, and performing mounting and welding on site, specifically, selecting a welding method, selecting a welding material, storing and keeping the welding material, generally stipulating about welding, checking before welding, cleaning before welding, positioned welding, welding a run-on plate, a lead-out plate and a welding lining plate, and meeting the requirements of double-groove full penetration back gouging. The hoisting construction method has the advantages that potential safety hazards are reduced, the labor cost is reduced, and the mounting efficiency, rigidity and construction progress of the steel members are improved.
本发明公开了一种管廊钢构件吊装施工方法,包括以下操作步骤:S1:吊装前准备:钢构件运输、包装、运输、装卸、堆放;S2:钢构件进场检验、测量、复验;S3:钢结构安装准备工作:施工现场准备;设备的选用;S4:钢结构吊装,吊运基本步骤:试吊、吊运就位;S5:钢平台吊装,现场安装焊接;焊接方法的选择、焊接材料的选择、焊接材料的储存保管、焊接一般规定、焊前检查、焊前清理、定位焊、焊接引弧板、引出板和焊接衬板要求同制作、双面坡口全熔透清根要求;本发明具有降低了安全隐患,降低了人工成本,提高了钢构件的安装效率、刚性和施工进度的优点。
Hoisting construction method for pipe gallery steel members
一种管廊钢构件吊装施工方法
WANG TONG (Autor:in) / HOU YONGPENG (Autor:in) / GUO ZHENZHI (Autor:in) / PENG RUI (Autor:in) / ZHANG ZIHAO (Autor:in) / LIU YIFEI (Autor:in) / GU XIAODONG (Autor:in)
14.01.2022
Patent
Elektronische Ressource
Chinesisch
Hoisting pipe gallery pipeline joint sealing structure and hoisting pipe gallery
Europäisches Patentamt | 2023
|Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
Europäisches Patentamt | 2016
|