Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel industrial modular house and construction method thereof
The invention relates to a novel industrial modular house and a construction method thereof, and belongs to the technical field of civil engineering. The method comprises the following steps that S1, wall surface modules, roof surface modules and supporting modules of various models are prefabricated in a factory in a standardized mode; S2, concrete foundation pouring is conducted on a construction site; S3, the prefabricated modules are installed in a spliced mode to form a main body steel structure frame; and S4, composite boards are installed on an outer wall and a roof, and partition walls, doors and windows are installed. A novel industrial modular house is built and comprises a concrete foundation, a steel structure frame installed on the concrete foundation and composite boards covering the steel structure frame, wherein the steel structure frame is composed of prefabricated standard modules and comprises wall face modules, supporting modules and roof modules, bolt holes are formed in the wall face modules, the roof modules and the supporting modules, and connecting plates are connected to the wall face modules, the roof modules and the supporting modules in a welded mode to serve as fixing joints. The building requirement for rapid installation of house building, the use requirement for multi-scene application and the environment-friendly requirement for repeated use are met.
本发明涉及一种新型工业化模块式房屋及其建造方法,属于土木工程技术领域,该方法通过S1.将多种型号的墙面模块、屋面模块和支撑模块在工厂进行标准化预制;S2.施工现场进行混凝土基础浇筑;S3.将预制模块拼接安装组成主体钢结构框架;S4.将复合板材安装至外墙和屋顶,并安装隔墙和门窗。建造了一种新型工业化模块式房屋,包括混凝土基础、安装于混凝土基础上的钢结构框架、覆盖于钢结构框架上的复合板材,钢结构框架由预制标准模块组成,包括墙面模块、支撑模块和屋面模块;墙面模块、屋面模块和支撑模块上开设有螺栓孔,并焊接有连接板作为固定节点。满足了房屋建造快速安装的建造要求、多场景适用的使用要求、可重复使用的环保要求。
Novel industrial modular house and construction method thereof
The invention relates to a novel industrial modular house and a construction method thereof, and belongs to the technical field of civil engineering. The method comprises the following steps that S1, wall surface modules, roof surface modules and supporting modules of various models are prefabricated in a factory in a standardized mode; S2, concrete foundation pouring is conducted on a construction site; S3, the prefabricated modules are installed in a spliced mode to form a main body steel structure frame; and S4, composite boards are installed on an outer wall and a roof, and partition walls, doors and windows are installed. A novel industrial modular house is built and comprises a concrete foundation, a steel structure frame installed on the concrete foundation and composite boards covering the steel structure frame, wherein the steel structure frame is composed of prefabricated standard modules and comprises wall face modules, supporting modules and roof modules, bolt holes are formed in the wall face modules, the roof modules and the supporting modules, and connecting plates are connected to the wall face modules, the roof modules and the supporting modules in a welded mode to serve as fixing joints. The building requirement for rapid installation of house building, the use requirement for multi-scene application and the environment-friendly requirement for repeated use are met.
本发明涉及一种新型工业化模块式房屋及其建造方法,属于土木工程技术领域,该方法通过S1.将多种型号的墙面模块、屋面模块和支撑模块在工厂进行标准化预制;S2.施工现场进行混凝土基础浇筑;S3.将预制模块拼接安装组成主体钢结构框架;S4.将复合板材安装至外墙和屋顶,并安装隔墙和门窗。建造了一种新型工业化模块式房屋,包括混凝土基础、安装于混凝土基础上的钢结构框架、覆盖于钢结构框架上的复合板材,钢结构框架由预制标准模块组成,包括墙面模块、支撑模块和屋面模块;墙面模块、屋面模块和支撑模块上开设有螺栓孔,并焊接有连接板作为固定节点。满足了房屋建造快速安装的建造要求、多场景适用的使用要求、可重复使用的环保要求。
Novel industrial modular house and construction method thereof
一种新型工业化模块式房屋及其建造方法
XIANG YUANMING (Autor:in) / JIANG YU (Autor:in) / ZHANG BO (Autor:in) / LUO XIAOFENG (Autor:in)
14.01.2022
Patent
Elektronische Ressource
Chinesisch
Modular assembly type house system and construction method thereof
Europäisches Patentamt | 2022
|Modular combined type constructed container house and construction method thereof
Europäisches Patentamt | 2022
|