Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a concrete construction method. The concrete construction method comprises the following steps that S1, a soil sample at a construction site is taken for detection; S2, raw materials are selected, concrete is prepared, and a transportation plan is made according to the concrete pouring time and distance; and S3, pre-embedded steel bars and formworks are installed on the construction site, and the transported concrete is detected through an ultrasonic rebound method; According to the method, the soil texture of the construction site is detected, then different additives are added into the concrete according to the characteristic phase of the soil texture, so that the concrete is more practical to the soil texture of the construction site, and then the quality of the concrete is detected through the ultrasonic rebound method; and the concrete is poured through the slope layering, sequential pushing and integral pouring method, the quality of the finally-formed concrete is improved, the internal and external temperature difference of the concrete is detected through a temperature sensor, the curing effect is improved, and the situation that the concrete cracks is avoided.
本发明公开了一种混凝土施工方法,包括以下步骤:S1、取施工现场的土质样品进行检测;S2、选取原材料,配置混凝土,并通过混凝土浇筑的时间与距离制定运输计划;S3、在施工现场安装预埋钢筋及模板,并通过超声回弹法对运输后的混凝土进行检测;本发明通过对施工现场的土质进行检测,然后根据土质的特性相混凝土中添加不同的外加剂,从而使混凝土更实用与施工现场的土质,然后通过超声回弹法对混凝土的质量进行检测,然后利用斜面分层、依次推进、整体浇筑法对混凝土进行浇注工作,提供了最终成型后的混凝土的品质,然后通过温度传感器对混凝土的内外温度差进行检测,增加了养护效果,避免了混凝土开裂的情况发生。
The invention discloses a concrete construction method. The concrete construction method comprises the following steps that S1, a soil sample at a construction site is taken for detection; S2, raw materials are selected, concrete is prepared, and a transportation plan is made according to the concrete pouring time and distance; and S3, pre-embedded steel bars and formworks are installed on the construction site, and the transported concrete is detected through an ultrasonic rebound method; According to the method, the soil texture of the construction site is detected, then different additives are added into the concrete according to the characteristic phase of the soil texture, so that the concrete is more practical to the soil texture of the construction site, and then the quality of the concrete is detected through the ultrasonic rebound method; and the concrete is poured through the slope layering, sequential pushing and integral pouring method, the quality of the finally-formed concrete is improved, the internal and external temperature difference of the concrete is detected through a temperature sensor, the curing effect is improved, and the situation that the concrete cracks is avoided.
本发明公开了一种混凝土施工方法,包括以下步骤:S1、取施工现场的土质样品进行检测;S2、选取原材料,配置混凝土,并通过混凝土浇筑的时间与距离制定运输计划;S3、在施工现场安装预埋钢筋及模板,并通过超声回弹法对运输后的混凝土进行检测;本发明通过对施工现场的土质进行检测,然后根据土质的特性相混凝土中添加不同的外加剂,从而使混凝土更实用与施工现场的土质,然后通过超声回弹法对混凝土的质量进行检测,然后利用斜面分层、依次推进、整体浇筑法对混凝土进行浇注工作,提供了最终成型后的混凝土的品质,然后通过温度传感器对混凝土的内外温度差进行检测,增加了养护效果,避免了混凝土开裂的情况发生。
Concrete construction method
一种混凝土施工方法
DONG DAYONG (Autor:in)
14.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste