Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mountain land water and soil loss treatment method
The invention discloses a mountain land water and soil loss treatment method. The mountain land water and soil loss treatment method comprises the following steps that A, a contour line of a treatment area is drawn, and ditches are dug along the contour line; B, concrete bases are poured in the ditches, prefabricated concrete inserting blocks are inserted into the concrete bases, hanging holes are formed in the concrete inserting blocks, longitudinally-laid straw ropes are bound between the concrete inserting blocks in the adjacent ditches and fixed to the hanging holes, a plurality of transversely-laid straw ropes are bound between the adjacent straw ropes, and all the straw ropes are laid in a crossed mode to divide planting grids; C, organic fertilizer is applied to the planting grids, then the planting grids are covered with a soil layer, and standing is carried out for 7-10 days after watering; D, arbor saplings are transplanted in the planting grids, and shrub seeds are sown between the adjacent planting grids; and E, later tree maintenance is carried out. The defects in the prior art can be overcome, the earth and stone work amount in the water and soil loss treatment process is reduced, and the treatment cost is effectively reduced.
本发明公开了一种山地水土流失治理方法,包括以下步骤:A、绘制治理地区的等高线,沿着等高线开挖沟渠;B、在沟渠中浇筑混凝土基座,在混凝土基座内插接预制的混凝土插块,混凝土插块上设置有挂孔,相邻沟渠中的混凝土插块之间绑扎纵向铺设的稻草绳,稻草绳固定在挂孔上,相邻稻草绳之间绑扎有若干条横向铺设的稻草绳,全部稻草绳交叉铺设划分出栽种网格;C、在栽种网格内施加有机肥,然后覆盖土层,浇水后静置7~10天;D、在栽种网格中移栽乔木类树苗,在相邻栽种网格之间播撒灌木类种子;E、进行后期的树木养护。本发明能够改进现有技术的不足,减少水土流失治理过程的土石方作业量,有效的降低治理成本。
Mountain land water and soil loss treatment method
The invention discloses a mountain land water and soil loss treatment method. The mountain land water and soil loss treatment method comprises the following steps that A, a contour line of a treatment area is drawn, and ditches are dug along the contour line; B, concrete bases are poured in the ditches, prefabricated concrete inserting blocks are inserted into the concrete bases, hanging holes are formed in the concrete inserting blocks, longitudinally-laid straw ropes are bound between the concrete inserting blocks in the adjacent ditches and fixed to the hanging holes, a plurality of transversely-laid straw ropes are bound between the adjacent straw ropes, and all the straw ropes are laid in a crossed mode to divide planting grids; C, organic fertilizer is applied to the planting grids, then the planting grids are covered with a soil layer, and standing is carried out for 7-10 days after watering; D, arbor saplings are transplanted in the planting grids, and shrub seeds are sown between the adjacent planting grids; and E, later tree maintenance is carried out. The defects in the prior art can be overcome, the earth and stone work amount in the water and soil loss treatment process is reduced, and the treatment cost is effectively reduced.
本发明公开了一种山地水土流失治理方法,包括以下步骤:A、绘制治理地区的等高线,沿着等高线开挖沟渠;B、在沟渠中浇筑混凝土基座,在混凝土基座内插接预制的混凝土插块,混凝土插块上设置有挂孔,相邻沟渠中的混凝土插块之间绑扎纵向铺设的稻草绳,稻草绳固定在挂孔上,相邻稻草绳之间绑扎有若干条横向铺设的稻草绳,全部稻草绳交叉铺设划分出栽种网格;C、在栽种网格内施加有机肥,然后覆盖土层,浇水后静置7~10天;D、在栽种网格中移栽乔木类树苗,在相邻栽种网格之间播撒灌木类种子;E、进行后期的树木养护。本发明能够改进现有技术的不足,减少水土流失治理过程的土石方作业量,有效的降低治理成本。
Mountain land water and soil loss treatment method
一种山地水土流失治理方法
SHEN HUITAO (Autor:in)
18.01.2022
Patent
Elektronische Ressource
Chinesisch
Water and soil loss prevention equipment for comprehensive land improvement
Europäisches Patentamt | 2022
|Method for preserving water and soil in mountain slopes
Europäisches Patentamt | 2015
|