Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a pouring device for an insulation board wall. The pouring device comprises an outer mold, wherein the outer mold is used for forming the wall, an insulation board is fixed in the outer mold through a bracket. The pouring device is characterized by further comprising a door-shaped frame; and the door-shaped frame is installed on the periphery of the outer mold, two groups of pouring assemblies are arranged on a cross beam of the door-shaped frame located on the two sides of the insulation board, the two groups of pouring assemblies are symmetrically arranged relative to the insulation board, the pouring assemblies comprise lifting plates which can ascend and descend, sliding grooves are formed in the bottoms, close to the insulation board, of the lifting plates, and sliding strips which can slide in a reciprocating mode are installed in the sliding grooves. According to the pouring device, holes are punched in the insulation board, then concrete is fully pressed into the holes in the insulation board, and after the concrete is solidified, concrete walls in two cavities are firmly bonded with the insulation board in the middle, so that cracks are prevented from being generated between the concrete walls and the insulation board after the concrete walls are solidified, and the heat preservation and insulation effects of the insulation board wall can be prevented from being influenced.
本发明公开了一种用于绝热板墙体的浇注装置,包括用于成型墙体的外模具,所述外模具内通过支架固定有绝热板,其特征在于:还包括安装在外模具外围的门形架,位于绝热板两侧的所述门形架横梁上设置有两组浇注组件,且两组浇注组件关于绝热板对称设置;所述浇注组件包括可升降的升降板,所述升降板靠近绝热板的底部开设有滑槽,且滑槽内安装有可往复滑动的滑条。本发明通过将绝热板上扎孔,然后使混凝土更加充分地压入绝热板上的孔内,等其凝固后,两个腔室内的混凝土墙会与中间的绝热板牢牢粘贴在一起,这样可以防止混凝土墙因凝固后与绝热板之间产生裂痕,进而可以避免影响到绝热板墙体的保温和隔热效果。
The invention discloses a pouring device for an insulation board wall. The pouring device comprises an outer mold, wherein the outer mold is used for forming the wall, an insulation board is fixed in the outer mold through a bracket. The pouring device is characterized by further comprising a door-shaped frame; and the door-shaped frame is installed on the periphery of the outer mold, two groups of pouring assemblies are arranged on a cross beam of the door-shaped frame located on the two sides of the insulation board, the two groups of pouring assemblies are symmetrically arranged relative to the insulation board, the pouring assemblies comprise lifting plates which can ascend and descend, sliding grooves are formed in the bottoms, close to the insulation board, of the lifting plates, and sliding strips which can slide in a reciprocating mode are installed in the sliding grooves. According to the pouring device, holes are punched in the insulation board, then concrete is fully pressed into the holes in the insulation board, and after the concrete is solidified, concrete walls in two cavities are firmly bonded with the insulation board in the middle, so that cracks are prevented from being generated between the concrete walls and the insulation board after the concrete walls are solidified, and the heat preservation and insulation effects of the insulation board wall can be prevented from being influenced.
本发明公开了一种用于绝热板墙体的浇注装置,包括用于成型墙体的外模具,所述外模具内通过支架固定有绝热板,其特征在于:还包括安装在外模具外围的门形架,位于绝热板两侧的所述门形架横梁上设置有两组浇注组件,且两组浇注组件关于绝热板对称设置;所述浇注组件包括可升降的升降板,所述升降板靠近绝热板的底部开设有滑槽,且滑槽内安装有可往复滑动的滑条。本发明通过将绝热板上扎孔,然后使混凝土更加充分地压入绝热板上的孔内,等其凝固后,两个腔室内的混凝土墙会与中间的绝热板牢牢粘贴在一起,这样可以防止混凝土墙因凝固后与绝热板之间产生裂痕,进而可以避免影响到绝热板墙体的保温和隔热效果。
Pouring device for insulation board wall
一种用于绝热板墙体的浇注装置
HAN HAIQING (Autor:in)
18.01.2022
Patent
Elektronische Ressource
Chinesisch
Thermal insulation integrated double-wall simultaneous pouring device
Europäisches Patentamt | 2024
|Built-in external wall thermal insulation concrete pouring distributing device and pouring method
Europäisches Patentamt | 2024
|Concrete pouring formwork system of built-in insulation board outer wall
Europäisches Patentamt | 2021
|