High pier construction device and mounting method thereof
The invention provides a high pier construction device and a mounting method thereof, and relates to the field of bridge construction. The high pier construction device comprises a bearing platform poured around a pier, a plurality of supporting tops are pre-buried in the bearing platform and distributed in an array mode, a column assembly is installed at the top of each supporting top, the supporting tops are used for jacking the column assemblies, and a construction platform is erected at the tops of at least four sets of column assemblies; a crane assembly is installed on the top of any column assembly, and a diagonal bridging for a constructor to climb is arranged between any two adjacent column assemblies. The cross bridging for a constructor to climb is arranged between any two adjacent column assemblies, the constructor can climb on one side of the step ladder construction platform through the cross bridging, the climbing efficiency of the constructor is effectively improved through the design, the time for climbing is greatly shortened, and then the working efficiency is improved; compared with an existing creeping formwork technology, the creeping formwork efficiency can be improved by more than 50% when constructors utilize the device.
本发明提出了一种高桥墩施工装置及其安装方法,涉及桥梁施工领域。一种高桥墩施工装置,包括环绕桥墩浇筑的承台,承台内预埋有多根支撑顶,多根支撑顶呈阵列分布,每根支撑顶顶部均安装有柱体组件,支撑顶用于顶升柱体组件,至少四组柱体组件的顶部架设有一施工平台,任一柱体组件顶部安装有吊机组件,任意相邻的两组柱体组件之间设置有供施工人员攀爬的剪刀撑。任意相邻的两组柱体组件之间设置可供施工人员攀爬的剪刀撑,施工人员可通过剪刀撑设步梯施工平台一侧爬升,此种设计有效提高了施工人员的爬升效率,大大缩短了爬升所使用的时长,进而提高了工作效率;相比于现有爬模技术,施工人员利用本装置能够提高50%以上的爬模效率。
High pier construction device and mounting method thereof
The invention provides a high pier construction device and a mounting method thereof, and relates to the field of bridge construction. The high pier construction device comprises a bearing platform poured around a pier, a plurality of supporting tops are pre-buried in the bearing platform and distributed in an array mode, a column assembly is installed at the top of each supporting top, the supporting tops are used for jacking the column assemblies, and a construction platform is erected at the tops of at least four sets of column assemblies; a crane assembly is installed on the top of any column assembly, and a diagonal bridging for a constructor to climb is arranged between any two adjacent column assemblies. The cross bridging for a constructor to climb is arranged between any two adjacent column assemblies, the constructor can climb on one side of the step ladder construction platform through the cross bridging, the climbing efficiency of the constructor is effectively improved through the design, the time for climbing is greatly shortened, and then the working efficiency is improved; compared with an existing creeping formwork technology, the creeping formwork efficiency can be improved by more than 50% when constructors utilize the device.
本发明提出了一种高桥墩施工装置及其安装方法,涉及桥梁施工领域。一种高桥墩施工装置,包括环绕桥墩浇筑的承台,承台内预埋有多根支撑顶,多根支撑顶呈阵列分布,每根支撑顶顶部均安装有柱体组件,支撑顶用于顶升柱体组件,至少四组柱体组件的顶部架设有一施工平台,任一柱体组件顶部安装有吊机组件,任意相邻的两组柱体组件之间设置有供施工人员攀爬的剪刀撑。任意相邻的两组柱体组件之间设置可供施工人员攀爬的剪刀撑,施工人员可通过剪刀撑设步梯施工平台一侧爬升,此种设计有效提高了施工人员的爬升效率,大大缩短了爬升所使用的时长,进而提高了工作效率;相比于现有爬模技术,施工人员利用本装置能够提高50%以上的爬模效率。
High pier construction device and mounting method thereof
一种高桥墩施工装置及其安装方法
YANG DEYONG (Autor:in)
25.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Pier construction device and pier construction method
Europäisches Patentamt | 2024
|Pier construction device and pier construction method
Europäisches Patentamt | 2021
|Bridge prefabricated pier mounting structure and construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|