Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Efficient construction equipment for constructional engineering management
The invention relates to efficient construction equipment for constructional engineering management; the equipment comprises a box body, a discharging hole is formed in the center of the bottom face of the box body, a plurality of partition plates are installed in the box body and divide the interior of the box body into a plurality of storage bins, a plurality of round piles are stored in the storage bins, and a pushing device is arranged in each storage bin and comprises an electric winder. Electric winders are installed on the partition plates on the two sides of the storage bin, piling devices are arranged at the positions, corresponding to the discharging holes, of the top face of the box body, and a moving device is arranged below the box body. Round piles are stored in the storage bins composed of the box body and the partition plates, the round piles are pushed out of the discharging holes through the pushing devices, finally, the round piles are nailed on the corresponding ground through the piling devices, and the multiple functions of storage, transportation, discharging, piling and the like of the round piles can be achieved through the device; and the whole process is completely realized through mutual cooperation of all the devices, so that the automatic construction mode not only greatly reduces the labor intensity of workers in construction, but also effectively improves the construction efficiency and safety.
一种建筑工程管理用高效施工设备,包括箱体,箱体的底面中心开设出料孔,箱体的内部安装数块隔板,隔板将箱体内部分隔成数个储料仓,储料仓内储存数个圆桩,储料仓内设置推料装置,推料装置包括电动收卷器,储料仓两侧的隔板上安装电动收卷器,箱体的顶面对应出料孔处设置打桩装置,箱体的下方设置移动装置。本发明通过箱体与隔板组成的储料仓储存圆桩,通过推料装置将圆桩从出料孔推出,最后通过打桩装置将圆桩钉在对应的地面上,通过本装置能够实现圆桩的储存、运输、出料、打桩等多个功能,而且由于整个过程完全由各个装置相互配合实现,这种自动化施工方式不仅极大的降低了工人施工的劳动强度,而且还有效的提高了施工效率和安全性。
Efficient construction equipment for constructional engineering management
The invention relates to efficient construction equipment for constructional engineering management; the equipment comprises a box body, a discharging hole is formed in the center of the bottom face of the box body, a plurality of partition plates are installed in the box body and divide the interior of the box body into a plurality of storage bins, a plurality of round piles are stored in the storage bins, and a pushing device is arranged in each storage bin and comprises an electric winder. Electric winders are installed on the partition plates on the two sides of the storage bin, piling devices are arranged at the positions, corresponding to the discharging holes, of the top face of the box body, and a moving device is arranged below the box body. Round piles are stored in the storage bins composed of the box body and the partition plates, the round piles are pushed out of the discharging holes through the pushing devices, finally, the round piles are nailed on the corresponding ground through the piling devices, and the multiple functions of storage, transportation, discharging, piling and the like of the round piles can be achieved through the device; and the whole process is completely realized through mutual cooperation of all the devices, so that the automatic construction mode not only greatly reduces the labor intensity of workers in construction, but also effectively improves the construction efficiency and safety.
一种建筑工程管理用高效施工设备,包括箱体,箱体的底面中心开设出料孔,箱体的内部安装数块隔板,隔板将箱体内部分隔成数个储料仓,储料仓内储存数个圆桩,储料仓内设置推料装置,推料装置包括电动收卷器,储料仓两侧的隔板上安装电动收卷器,箱体的顶面对应出料孔处设置打桩装置,箱体的下方设置移动装置。本发明通过箱体与隔板组成的储料仓储存圆桩,通过推料装置将圆桩从出料孔推出,最后通过打桩装置将圆桩钉在对应的地面上,通过本装置能够实现圆桩的储存、运输、出料、打桩等多个功能,而且由于整个过程完全由各个装置相互配合实现,这种自动化施工方式不仅极大的降低了工人施工的劳动强度,而且还有效的提高了施工效率和安全性。
Efficient construction equipment for constructional engineering management
一种建筑工程管理用高效施工设备
WANG XINHUI (Autor:in) / ZHOU JUAN (Autor:in) / YANG PENGHUI (Autor:in) / WANG KUANGWEI (Autor:in)
28.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Construction equipment for constructional engineering
Europäisches Patentamt | 2020
|Construction safety protection equipment for constructional engineering management
Europäisches Patentamt | 2024
|Reinforcing construction equipment for constructional engineering
Europäisches Patentamt | 2023
|Spraying concrete construction equipment for constructional engineering
Europäisches Patentamt | 2021
|Foundation tamping equipment for constructional engineering construction
Europäisches Patentamt | 2021
|