Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile driver for civil engineering and pile driving method thereof
The invention discloses a pile driver for civil engineering and a pile driving method thereof; the pile driver comprises a pile frame, a sound insulation frame and a base, the pile frame is fixedly mounted at the top of the base, guide rods are fixedly mounted at the front end and the rear end of the pile frame, a movable frame is slidably mounted between the guide rods, and a pile hammer is fixedly mounted at the bottom of the movable frame; the sound insulation frame is slidably installed on the outer side of the pile frame, a limiting frame is fixedly installed at the bottom of the sound insulation frame, a protection frame is fixedly installed on the top of the sound insulation frame, a movable seat is installed penetrating the pile frame, a limiting clamp is fixedly installed on the inner side of the movable seat, and rolling wheels are movably installed on the inner side of the limiting clamp. Through the arrangement of the sound insulation frame, noises are effectively prevented from spreading to the periphery, through mutual cooperation of the limiting frame and the limiting clamp, the pile body can be kept in a vertical pile state and is not prone to skewing, the construction efficiency of piling is effectively improved, more convenience is brought to construction operation, and operation is convenient and fast.
本发明公开了一种土木工程用打桩机及其打桩方法,包括桩架、隔音架和底座,所述底座的顶部固定安装有桩架,所述桩架的前端与后端皆固定安装有导杆,所述导杆之间滑动安装有活动架,所述活动架的底部固定安装有桩锤,所述桩架的外侧滑动安装有隔音架,所述隔音架的底部固定安装有限位架,所述隔音架的顶部固定安装有防护架,所述桩架上贯穿安装有活动座,所述活动座的内侧固定安装有限位夹,所述限位夹的内侧活动安装有滚轮。本发明通过设置有隔音架,有效阻挡噪音传播至周围,通过限位架与限位夹的相互配合,使桩体可以保持垂直桩状态,不易发生歪斜的情况,有效的提高了打桩的施工效率,给施工操作带来较多的便利,操作方便快捷。
Pile driver for civil engineering and pile driving method thereof
The invention discloses a pile driver for civil engineering and a pile driving method thereof; the pile driver comprises a pile frame, a sound insulation frame and a base, the pile frame is fixedly mounted at the top of the base, guide rods are fixedly mounted at the front end and the rear end of the pile frame, a movable frame is slidably mounted between the guide rods, and a pile hammer is fixedly mounted at the bottom of the movable frame; the sound insulation frame is slidably installed on the outer side of the pile frame, a limiting frame is fixedly installed at the bottom of the sound insulation frame, a protection frame is fixedly installed on the top of the sound insulation frame, a movable seat is installed penetrating the pile frame, a limiting clamp is fixedly installed on the inner side of the movable seat, and rolling wheels are movably installed on the inner side of the limiting clamp. Through the arrangement of the sound insulation frame, noises are effectively prevented from spreading to the periphery, through mutual cooperation of the limiting frame and the limiting clamp, the pile body can be kept in a vertical pile state and is not prone to skewing, the construction efficiency of piling is effectively improved, more convenience is brought to construction operation, and operation is convenient and fast.
本发明公开了一种土木工程用打桩机及其打桩方法,包括桩架、隔音架和底座,所述底座的顶部固定安装有桩架,所述桩架的前端与后端皆固定安装有导杆,所述导杆之间滑动安装有活动架,所述活动架的底部固定安装有桩锤,所述桩架的外侧滑动安装有隔音架,所述隔音架的底部固定安装有限位架,所述隔音架的顶部固定安装有防护架,所述桩架上贯穿安装有活动座,所述活动座的内侧固定安装有限位夹,所述限位夹的内侧活动安装有滚轮。本发明通过设置有隔音架,有效阻挡噪音传播至周围,通过限位架与限位夹的相互配合,使桩体可以保持垂直桩状态,不易发生歪斜的情况,有效的提高了打桩的施工效率,给施工操作带来较多的便利,操作方便快捷。
Pile driver for civil engineering and pile driving method thereof
一种土木工程用打桩机及其打桩方法
XU JUNJIE (Autor:in) / FU ZONGGUO (Autor:in)
28.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Civil engineering pile driver with pile pulling function
Europäisches Patentamt | 2023
|