Large tower equipment and attached tower pipeline installation method
The invention discloses large tower equipment and an attached tower pipeline installation method. The method comprises the following steps: S1, preparing an attached tower pipeline material according to the design, then carrying out labor protection installation and pipe support installation at the same time, and carrying out the installation of an electrical instrument support after the labor protection installation is completed; S2, carrying out structural anti-corrosion paint repair on the tower equipment main body; S3, performing attached tower pipeline installation, illumination installation and equipment heat preservation at the same time; and then carrying out pipeline detection pressure testing and pipeline paint repair heat preservation on the installed attached tower pipeline; and S4, installing the tower equipment main body, hoisting through the hoisting technology of a single-host lifting delivery method in the installation process of the tower equipment main body, then adjusting through a clamp, a positioning bridge and a hydraulic jack, controlling the equipment alignment precision, adjusting the perpendicularity to be qualified, and welding. According to the method, high-altitude operation construction is reduced, the high-altitude operation risk is reduced, the ground construction proportion is increased, and the working efficiency is improved.
本发明公开一种大型塔设备及附塔管线安装方法,该方法包括步骤S1.按设计准备附塔管线材料,然后同时进行进行劳动保护安装和管支架安装,劳动保护安装完成后进行电气仪表支架安装;步骤S2.对塔设备主体进行结构防腐补漆;步骤S3.同时进行附塔管线安装、照明安装和设备保温;然后对安装好的附塔管线进行管线检测试压、管道补漆保温;步骤S4.进行塔设备主体安装,在塔设备主体安装过程中采用单主机抬吊递送法的吊装工艺进行吊装,然后采用卡具和定位码子及液压千斤顶调整、控制设备对口精度,垂直度调整合格后进行焊接。本发明的方法减少高空作业施工,降低高处作业风险,增加地面施工比例,提高工作效率。
Large tower equipment and attached tower pipeline installation method
The invention discloses large tower equipment and an attached tower pipeline installation method. The method comprises the following steps: S1, preparing an attached tower pipeline material according to the design, then carrying out labor protection installation and pipe support installation at the same time, and carrying out the installation of an electrical instrument support after the labor protection installation is completed; S2, carrying out structural anti-corrosion paint repair on the tower equipment main body; S3, performing attached tower pipeline installation, illumination installation and equipment heat preservation at the same time; and then carrying out pipeline detection pressure testing and pipeline paint repair heat preservation on the installed attached tower pipeline; and S4, installing the tower equipment main body, hoisting through the hoisting technology of a single-host lifting delivery method in the installation process of the tower equipment main body, then adjusting through a clamp, a positioning bridge and a hydraulic jack, controlling the equipment alignment precision, adjusting the perpendicularity to be qualified, and welding. According to the method, high-altitude operation construction is reduced, the high-altitude operation risk is reduced, the ground construction proportion is increased, and the working efficiency is improved.
本发明公开一种大型塔设备及附塔管线安装方法,该方法包括步骤S1.按设计准备附塔管线材料,然后同时进行进行劳动保护安装和管支架安装,劳动保护安装完成后进行电气仪表支架安装;步骤S2.对塔设备主体进行结构防腐补漆;步骤S3.同时进行附塔管线安装、照明安装和设备保温;然后对安装好的附塔管线进行管线检测试压、管道补漆保温;步骤S4.进行塔设备主体安装,在塔设备主体安装过程中采用单主机抬吊递送法的吊装工艺进行吊装,然后采用卡具和定位码子及液压千斤顶调整、控制设备对口精度,垂直度调整合格后进行焊接。本发明的方法减少高空作业施工,降低高处作业风险,增加地面施工比例,提高工作效率。
Large tower equipment and attached tower pipeline installation method
一种大型塔设备及附塔管线安装方法
LI PENGFEI (Autor:in) / CHEN TIANYU (Autor:in) / LIU WENSHUAI (Autor:in) / LAN YANG (Autor:in)
01.02.2022
Patent
Elektronische Ressource
Chinesisch