Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quick replacement method for tower footing steel tank of communication floor guyed tower
The invention discloses a quick replacement method for a tower footing steel tank of a communication floor guyed tower, which comprises the following steps that: firstly, the guyed tower is lifted, a lifting cable is firmly connected with the tower top of the guyed tower, and the guyed tower is lifted after the guyed tower is separated from an old tower footing steel tank; secondly, the tower footing steel tank is replaced, the old tower footing steel tank is dismantled, and the new tower footing steel tank is placed at the to-be-installed position and cleaned through a runner component; thirdly, the perpendicularity of the guyed tower is adjusted, and the perpendicularity of the guyed tower is adjusted through a plurality of supporting and adjusting devices; fourthly, a new tower footing steel tank is cleaned, specifically, the new tower footing steel tank is cleaned through a cleaning device, and anti-rust paint is sprayed; and fifthly, the new tower footing steel tank package, namely the new tower footing steel tank is encapsulated by using a grouting encapsulating material. According to the scheme for replacing the tower footing steel tank, the perpendicularity of the communication tower can be conveniently controlled, and a construction site can be conveniently and rapidly cleaned.
本发明公开了一种通信楼面拉线塔的塔基钢槽的快捷更换方法,包括以下步骤:步骤一、拉线塔的上吊,将吊缆与拉线塔塔顶牢固连接,待拉线塔与旧塔基钢槽分离后吊起拉线塔;步骤二、塔基钢槽的更换,拆除旧塔基钢槽并将新塔基钢槽放置在待安装位置并用流道部件进行清洁;步骤三、拉线塔垂直度调整,通过多个支撑调节装置对拉线塔垂直度进行调节;步骤四、新塔基钢槽的清洁,利用清洁装置对新塔基钢槽进行清洁并进行防锈漆喷涂;步骤五、新塔基钢槽的包封,用灌浆包封材料对新塔基钢槽进行包封。本发明是一种便于对通信塔垂直度进行控制的,便于对施工场地快速清洁的塔基钢槽更换方案。
Quick replacement method for tower footing steel tank of communication floor guyed tower
The invention discloses a quick replacement method for a tower footing steel tank of a communication floor guyed tower, which comprises the following steps that: firstly, the guyed tower is lifted, a lifting cable is firmly connected with the tower top of the guyed tower, and the guyed tower is lifted after the guyed tower is separated from an old tower footing steel tank; secondly, the tower footing steel tank is replaced, the old tower footing steel tank is dismantled, and the new tower footing steel tank is placed at the to-be-installed position and cleaned through a runner component; thirdly, the perpendicularity of the guyed tower is adjusted, and the perpendicularity of the guyed tower is adjusted through a plurality of supporting and adjusting devices; fourthly, a new tower footing steel tank is cleaned, specifically, the new tower footing steel tank is cleaned through a cleaning device, and anti-rust paint is sprayed; and fifthly, the new tower footing steel tank package, namely the new tower footing steel tank is encapsulated by using a grouting encapsulating material. According to the scheme for replacing the tower footing steel tank, the perpendicularity of the communication tower can be conveniently controlled, and a construction site can be conveniently and rapidly cleaned.
本发明公开了一种通信楼面拉线塔的塔基钢槽的快捷更换方法,包括以下步骤:步骤一、拉线塔的上吊,将吊缆与拉线塔塔顶牢固连接,待拉线塔与旧塔基钢槽分离后吊起拉线塔;步骤二、塔基钢槽的更换,拆除旧塔基钢槽并将新塔基钢槽放置在待安装位置并用流道部件进行清洁;步骤三、拉线塔垂直度调整,通过多个支撑调节装置对拉线塔垂直度进行调节;步骤四、新塔基钢槽的清洁,利用清洁装置对新塔基钢槽进行清洁并进行防锈漆喷涂;步骤五、新塔基钢槽的包封,用灌浆包封材料对新塔基钢槽进行包封。本发明是一种便于对通信塔垂直度进行控制的,便于对施工场地快速清洁的塔基钢槽更换方案。
Quick replacement method for tower footing steel tank of communication floor guyed tower
一种通信楼面拉线塔的塔基钢槽的快捷更换方法
LI JIAN (Autor:in) / LIANG MAOHUA (Autor:in) / PENG MINGRUI (Autor:in) / CAI WEIJUN (Autor:in) / CHEN KAN (Autor:in) / WAN MINGYUAN (Autor:in) / JIANG ZHEN (Autor:in) / YUAN XIN (Autor:in)
08.02.2022
Patent
Elektronische Ressource
Chinesisch
Communication guyed tower and assembling method thereof
Europäisches Patentamt | 2021
|Development of GFRP Monopole Guyed Communication Tower
ASCE | 2023
|