Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction point rapid dust falling device based on building engineering construction
The invention provides a construction point rapid dust falling device based on building engineering construction. The construction point rapid dust falling device based on building engineering construction comprises a water tank; a rotatable fog gun machine arranged at the top of the water tank; and water inlet devices, which are fixed to one side of the inner wall of the water tank, and comprise a partition plate, wherein the top of the inner wall of the partition plate is fixedly connected with a water suction pump, and a water outlet of the water suction pump is fixedly connected with a conveying pipeline. According to the construction point rapid dust falling device based on building engineering construction, two water inlet devices are arranged and can be used for sucking water of pipelines and water of rivers into the water tank for use, the connecting assembly can be connected with the pipelines of different specifications and sizes, impurities in the river water can be filtered through a water taking assembly, the water source is expanded, and water can be conveniently taken at any time and then sprayed out by the fog gun machine for dust falling.
本发明提供一种基于建筑工程施工用施工点快速降尘装置。所述基于建筑工程施工用施工点快速降尘装置包括:水箱和设置于所述水箱顶部的可转动式的雾炮机;进水装置,所述进水装置固定于所述水箱内壁的一侧,所述进水装置包括分隔板,所述分隔板内壁的顶部固定连接有抽水泵,所述抽水泵的出水口固定连接有输送管道。本发明提供的基于建筑工程施工用施工点快速降尘装置通过设置两个进水装置可以分别用于将管道的水和河流的水吸入到水箱的内部使用,连接组件可以和不同规格尺寸的管道连接,通过取水组件则可以对河流水中的杂质进行过滤,扩展了水的来源,方便随时进行取水再由雾炮机喷出进行降尘。
Construction point rapid dust falling device based on building engineering construction
The invention provides a construction point rapid dust falling device based on building engineering construction. The construction point rapid dust falling device based on building engineering construction comprises a water tank; a rotatable fog gun machine arranged at the top of the water tank; and water inlet devices, which are fixed to one side of the inner wall of the water tank, and comprise a partition plate, wherein the top of the inner wall of the partition plate is fixedly connected with a water suction pump, and a water outlet of the water suction pump is fixedly connected with a conveying pipeline. According to the construction point rapid dust falling device based on building engineering construction, two water inlet devices are arranged and can be used for sucking water of pipelines and water of rivers into the water tank for use, the connecting assembly can be connected with the pipelines of different specifications and sizes, impurities in the river water can be filtered through a water taking assembly, the water source is expanded, and water can be conveniently taken at any time and then sprayed out by the fog gun machine for dust falling.
本发明提供一种基于建筑工程施工用施工点快速降尘装置。所述基于建筑工程施工用施工点快速降尘装置包括:水箱和设置于所述水箱顶部的可转动式的雾炮机;进水装置,所述进水装置固定于所述水箱内壁的一侧,所述进水装置包括分隔板,所述分隔板内壁的顶部固定连接有抽水泵,所述抽水泵的出水口固定连接有输送管道。本发明提供的基于建筑工程施工用施工点快速降尘装置通过设置两个进水装置可以分别用于将管道的水和河流的水吸入到水箱的内部使用,连接组件可以和不同规格尺寸的管道连接,通过取水组件则可以对河流水中的杂质进行过滤,扩展了水的来源,方便随时进行取水再由雾炮机喷出进行降尘。
Construction point rapid dust falling device based on building engineering construction
一种基于建筑工程施工用施工点快速降尘装置
SUN MINGYU (Autor:in) / ZHAO TAO (Autor:in) / FENG QILI (Autor:in)
11.02.2022
Patent
Elektronische Ressource
Chinesisch
Building engineering construction dust falling equipment
Europäisches Patentamt | 2024
|Dust falling structure for building engineering construction
Europäisches Patentamt | 2022
|Dust falling equipment for building engineering construction
Europäisches Patentamt | 2021
|Environment-friendly rapid dust falling equipment for building construction and dust falling method
Europäisches Patentamt | 2021
|