Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building for emergency rescue
According to the fabricated building for emergency rescue, a house is designed to be of a foldable structure, transportation and assembly are convenient, the building time of the house is shortened, the safety of workers is guaranteed, excessive damage to a house framework in the mounting and dismounting process is avoided, the repeated utilization rate is increased, and the requirement of quick rescue can be met. The fabricated building includes first folding wall bodies, second folding wall bodies, a base and a roof. Each first folding wall body is provided with a first connecting surface, supporting bodies are arranged on the two surfaces perpendicular to the first connecting surface respectively, the supporting bodies are perpendicular to the first folding wall bodies, the number of the first folding wall bodies is two, and the two first folding wall bodies are oppositely arranged. Each second folding wall body is provided with a second connecting face, the number of the second folding wall bodies is two, and the two second folding wall bodies are oppositely arranged. The base is provided with a first fixing face and a second fixing face, the first fixing face is rotationally connected with the first connecting face, and the second fixing face is rotationally connected with the second connecting face.
本发明的目的是提供一种紧急救援用装配式建筑,将房屋设计为可折叠的结构,方便运输和组装,缩短了房屋的搭建时间,保证了工作人员的安全,避免了安装与拆卸的过程对房屋架构造成过度的损坏,增加了可重复利用率,能够满足快速救援的需求。包括:第一折叠墙体、第二折叠墙体、基座、屋顶。第一折叠墙体设置有第一连接面,与第一连接面垂直的两面分别设置有支撑体,支撑体与第一折叠墙体垂直,第一折叠墙体设置有两块,且两块第一折叠墙体相对设置。第二折叠墙体设置有第二连接面,第二折叠墙体设置有两块,且两块第二折叠墙体相对设置。基座设置有第一固定面和第二固定面,第一固定面与第一连接面转动连接,第二固定面与第二连接面转动连接。
Fabricated building for emergency rescue
According to the fabricated building for emergency rescue, a house is designed to be of a foldable structure, transportation and assembly are convenient, the building time of the house is shortened, the safety of workers is guaranteed, excessive damage to a house framework in the mounting and dismounting process is avoided, the repeated utilization rate is increased, and the requirement of quick rescue can be met. The fabricated building includes first folding wall bodies, second folding wall bodies, a base and a roof. Each first folding wall body is provided with a first connecting surface, supporting bodies are arranged on the two surfaces perpendicular to the first connecting surface respectively, the supporting bodies are perpendicular to the first folding wall bodies, the number of the first folding wall bodies is two, and the two first folding wall bodies are oppositely arranged. Each second folding wall body is provided with a second connecting face, the number of the second folding wall bodies is two, and the two second folding wall bodies are oppositely arranged. The base is provided with a first fixing face and a second fixing face, the first fixing face is rotationally connected with the first connecting face, and the second fixing face is rotationally connected with the second connecting face.
本发明的目的是提供一种紧急救援用装配式建筑,将房屋设计为可折叠的结构,方便运输和组装,缩短了房屋的搭建时间,保证了工作人员的安全,避免了安装与拆卸的过程对房屋架构造成过度的损坏,增加了可重复利用率,能够满足快速救援的需求。包括:第一折叠墙体、第二折叠墙体、基座、屋顶。第一折叠墙体设置有第一连接面,与第一连接面垂直的两面分别设置有支撑体,支撑体与第一折叠墙体垂直,第一折叠墙体设置有两块,且两块第一折叠墙体相对设置。第二折叠墙体设置有第二连接面,第二折叠墙体设置有两块,且两块第二折叠墙体相对设置。基座设置有第一固定面和第二固定面,第一固定面与第一连接面转动连接,第二固定面与第二连接面转动连接。
Fabricated building for emergency rescue
一种紧急救援用装配式建筑
FANG ZEZHI (Autor:in) / XU HUI (Autor:in) / LI FUGUI (Autor:in) / CHAI BIN (Autor:in) / SUN HAO (Autor:in) / DING JIFEI (Autor:in) / MA CUICUI (Autor:in)
11.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
EMERGENCY RESCUE APPARATUS AND EMERGENCY RESCUE VEHICLE
Europäisches Patentamt | 2023
|