Pile-beam integrated construction method for tubular pile foundation construction and cover beam plate assembly
The invention discloses a pile-beam integrated construction method for tubular pile foundation construction and cover beam plate assembly. The pile-beam integrated construction method comprises the following steps that S1, piling and guiding hole; S2, hoisting and transferring a pipe pile; S3, performing pile feeding; S4, driving a first section of the pipe pile; S5, performing steps of pile welding, pile driving and pile cutting; S6, driving a second whole pile; S7, transferring a bent cap; S8, pouring and feeding; S9, transferring a double-limb T beam; and S10, performing beam falling. The invention relates to the technical field of bridge construction. Through operation of related equipment such as the temporary supporting legs, a piling device and front auxiliary supporting legs and adoption of a corresponding construction technical method, the construction precision of the prestressed pipe pile and the installation precision of the bent cap are improved, the construction operability continuity is improved, the process time is shortened, the efficiency is improved, and occupation of shortcuts and construction sites is reduced.
本发明公开了一种管桩基础施工及盖梁梁板拼装的桩梁一体化施工方法,包括如下步骤:步骤S1:打桩引孔;步骤S2:管桩起吊转运;步骤S3:喂桩;步骤S4:第一节管桩打设;步骤S5:焊桩打桩割桩;步骤S6:第二根整桩打设;步骤S7:盖梁转运;步骤S8:灌注上料;步骤S9:双肢T梁转运;步骤S10:落梁。本发明涉及桥梁施工技术领域。通过临时支腿、打桩装置、前辅助支腿等相关设备的操作和采用对应的施工技术方法提高预应力管桩施工精度、盖梁安装精度,提高施工可操作性连续性,减少工序时间,提高功效,减少便道和施工场地的占用。
Pile-beam integrated construction method for tubular pile foundation construction and cover beam plate assembly
The invention discloses a pile-beam integrated construction method for tubular pile foundation construction and cover beam plate assembly. The pile-beam integrated construction method comprises the following steps that S1, piling and guiding hole; S2, hoisting and transferring a pipe pile; S3, performing pile feeding; S4, driving a first section of the pipe pile; S5, performing steps of pile welding, pile driving and pile cutting; S6, driving a second whole pile; S7, transferring a bent cap; S8, pouring and feeding; S9, transferring a double-limb T beam; and S10, performing beam falling. The invention relates to the technical field of bridge construction. Through operation of related equipment such as the temporary supporting legs, a piling device and front auxiliary supporting legs and adoption of a corresponding construction technical method, the construction precision of the prestressed pipe pile and the installation precision of the bent cap are improved, the construction operability continuity is improved, the process time is shortened, the efficiency is improved, and occupation of shortcuts and construction sites is reduced.
本发明公开了一种管桩基础施工及盖梁梁板拼装的桩梁一体化施工方法,包括如下步骤:步骤S1:打桩引孔;步骤S2:管桩起吊转运;步骤S3:喂桩;步骤S4:第一节管桩打设;步骤S5:焊桩打桩割桩;步骤S6:第二根整桩打设;步骤S7:盖梁转运;步骤S8:灌注上料;步骤S9:双肢T梁转运;步骤S10:落梁。本发明涉及桥梁施工技术领域。通过临时支腿、打桩装置、前辅助支腿等相关设备的操作和采用对应的施工技术方法提高预应力管桩施工精度、盖梁安装精度,提高施工可操作性连续性,减少工序时间,提高功效,减少便道和施工场地的占用。
Pile-beam integrated construction method for tubular pile foundation construction and cover beam plate assembly
一种管桩基础施工及盖梁梁板拼装的桩梁一体化施工方法
LIU HONGBO (Autor:in) / LIU ZHIFENG (Autor:in) / DENG WENHAO (Autor:in) / SU NIANJIU (Autor:in) / LIN WENPU (Autor:in) / YANG XINGYI (Autor:in) / HE LI (Autor:in) / ZHANG SONG (Autor:in) / ZHOU YANG (Autor:in) / LIN CHAO (Autor:in)
15.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2024
|Pile beam foundation structure and construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|Waterproof construction method of tubular pile foundation
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|