Construction method of underground structure side wall
The invention discloses a construction method of an underground structure side wall. The construction method comprises the following steps: foundation pouring, installation of a fixed framework on the periphery of a side wall, installation of a steel bar framework of the side wall, aerial pouring of the side wall, consolidation of the side wall, and assembly of the side wall. The construction of the side wall of the underground structure is completed, the pouring of the side wall is finished in the air, the angle can be adjusted in the air after pouring is completed, concrete condensation can be effectively accelerated, the construction efficiency is greatly improved, the construction time is shortened, manpower and material resources are saved, and the defect that the construction period is long is effectively overcome.
本发明公开了一种地下结构侧墙的施工方法,包括以下步骤:通过地基的浇筑、侧墙外围固定骨架的安装、侧墙钢筋骨架的安装、侧墙的空中浇筑、侧墙的凝结以及侧墙的组装完成对地下结构侧墙的施工,使侧墙的浇筑在空中完成,并且浇筑完成后能够在空中调节角度,能够有效加快混凝土的凝结,大大提高施工效率,缩短施工时间,节约人力物力,有效解决了施工周期长这一弊端。
Construction method of underground structure side wall
The invention discloses a construction method of an underground structure side wall. The construction method comprises the following steps: foundation pouring, installation of a fixed framework on the periphery of a side wall, installation of a steel bar framework of the side wall, aerial pouring of the side wall, consolidation of the side wall, and assembly of the side wall. The construction of the side wall of the underground structure is completed, the pouring of the side wall is finished in the air, the angle can be adjusted in the air after pouring is completed, concrete condensation can be effectively accelerated, the construction efficiency is greatly improved, the construction time is shortened, manpower and material resources are saved, and the defect that the construction period is long is effectively overcome.
本发明公开了一种地下结构侧墙的施工方法,包括以下步骤:通过地基的浇筑、侧墙外围固定骨架的安装、侧墙钢筋骨架的安装、侧墙的空中浇筑、侧墙的凝结以及侧墙的组装完成对地下结构侧墙的施工,使侧墙的浇筑在空中完成,并且浇筑完成后能够在空中调节角度,能够有效加快混凝土的凝结,大大提高施工效率,缩短施工时间,节约人力物力,有效解决了施工周期长这一弊端。
Construction method of underground structure side wall
一种地下结构侧墙的施工方法
ZHU ZHOUBING (Autor:in) / CHEN ZHI (Autor:in) / CHEN WEIFENG (Autor:in) / CHEN JUN (Autor:in)
15.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of side wall of underground structure
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|