Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water permeable brick with positioning combination function
The invention relates to the technical field of water permeable bricks, and discloses a water permeable brick with a positioning combination function, the water permeable brick comprises a brick body, two groups of positioning blocks are arranged on the front side and the rear side of the brick body, and a connecting column is fixedly mounted between the two positioning blocks on the same side edge of the brick body. According to the water permeable brick with the positioning combining function, in the using process, one brick body is fixedly installed on the ground, then the positioning blocks on the other brick body correspond to each other, the height of the positioning blocks is set in the production process, and after two different brick bodies of the same specification are attached, the brick bodies are fixed to form the water permeable brick with the positioning and combining functions. The sum of the distances between the two positioning blocks is just the gap interval required for laying the water permeable bricks, so that in the laying process, a gap does not need to be reserved deliberately, the laying progress is accelerated, meanwhile, the two mounting discs correspond to each other and deliberately determine the positions between the water permeable bricks in cooperation with the effect of the mounting discs, and the combined effect of positioning is achieved.
本发明涉及透水砖技术领域,且公开了一种具有定位组合功能的透水砖,包括砖体,所述砖体的前后两侧设置有两组定位块,所述砖体上且在同一侧边上两个定位块之间固定安装有连接柱。该具有定位组合功能的透水砖,通过在使用过程中,将一块砖体固定安装在地面上,然后将另一块砖体上的定位块相互对应,定位块的高度在生产时已经制定好,是相同规格的,两个不同的砖体贴合之后,两个定位块之间的距离之和正好是铺设透水砖所要求的间隙间隔,从而在铺设过程中,不需要刻意留有空隙,加快了铺设的进度,同时配合安装盘的作用,两个安装盘对应,刻意确定透水砖之间的位置,达到了定位的组合的效果。
Water permeable brick with positioning combination function
The invention relates to the technical field of water permeable bricks, and discloses a water permeable brick with a positioning combination function, the water permeable brick comprises a brick body, two groups of positioning blocks are arranged on the front side and the rear side of the brick body, and a connecting column is fixedly mounted between the two positioning blocks on the same side edge of the brick body. According to the water permeable brick with the positioning combining function, in the using process, one brick body is fixedly installed on the ground, then the positioning blocks on the other brick body correspond to each other, the height of the positioning blocks is set in the production process, and after two different brick bodies of the same specification are attached, the brick bodies are fixed to form the water permeable brick with the positioning and combining functions. The sum of the distances between the two positioning blocks is just the gap interval required for laying the water permeable bricks, so that in the laying process, a gap does not need to be reserved deliberately, the laying progress is accelerated, meanwhile, the two mounting discs correspond to each other and deliberately determine the positions between the water permeable bricks in cooperation with the effect of the mounting discs, and the combined effect of positioning is achieved.
本发明涉及透水砖技术领域,且公开了一种具有定位组合功能的透水砖,包括砖体,所述砖体的前后两侧设置有两组定位块,所述砖体上且在同一侧边上两个定位块之间固定安装有连接柱。该具有定位组合功能的透水砖,通过在使用过程中,将一块砖体固定安装在地面上,然后将另一块砖体上的定位块相互对应,定位块的高度在生产时已经制定好,是相同规格的,两个不同的砖体贴合之后,两个定位块之间的距离之和正好是铺设透水砖所要求的间隙间隔,从而在铺设过程中,不需要刻意留有空隙,加快了铺设的进度,同时配合安装盘的作用,两个安装盘对应,刻意确定透水砖之间的位置,达到了定位的组合的效果。
Water permeable brick with positioning combination function
一种具有定位组合功能的透水砖
HE TIANSONG (Autor:in) / ZHENG KEQIN (Autor:in) / DENG SHIKUI (Autor:in) / CUI BINGFENG (Autor:in)
18.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Water permeable brick with sewage interception function
Europäisches Patentamt | 2021
|