The invention provides a water storage and tide blocking gate system. The water storage and tide blocking gate system comprises a bottom plate, a working gate position, a temporary storage frame, gate units and a driving mechanism. The working gate position comprises a positioning frame and a lifting mechanism, the working gate position is arranged on the bottom plate, and the lifting mechanism is arranged outside the positioning frame; the cache frame is arranged on the bottom plate; the gate unit comprises a unit main body and a guide table, the guide table is arranged outside the unit main body, and the gate unit is temporarily stored on the cache frame through the unit main body; and the driving mechanism drives the gate unit to move into the working gate position along the buffer frame. After the gate is put into use, the load borne by the gate in the opening and closing process is the dead weight of a single gate unit, other extra equipment is not needed in the transferring and assembling process, the whole assembling and disassembling process is simple, convenient and efficient, and a concrete foundation cannot be damaged.
本发明提供了一种蓄水挡潮闸门系统,包括底板、工作闸位、缓存架、闸门单元和驱动机构;工作闸位包括定位框和升降机构,工作闸位设置于底板上,升降机构设置于定位框外;缓存架设置于底板上;闸门单元包括单元主体和导向台,导向台设置于单元主体外,闸门单元以其单元主体暂存于缓存架上;驱动机构带动闸门单元沿缓存架移动进入工作闸位。投入使用后,闸门开闭过程中承受的载荷为单块闸门单元的自重,并且转运、装配过程中无需用到其它额外的设备,整个装卸过程简便高效,也不会对混凝土基础产生损毁。
Water storage tide gate system
The invention provides a water storage and tide blocking gate system. The water storage and tide blocking gate system comprises a bottom plate, a working gate position, a temporary storage frame, gate units and a driving mechanism. The working gate position comprises a positioning frame and a lifting mechanism, the working gate position is arranged on the bottom plate, and the lifting mechanism is arranged outside the positioning frame; the cache frame is arranged on the bottom plate; the gate unit comprises a unit main body and a guide table, the guide table is arranged outside the unit main body, and the gate unit is temporarily stored on the cache frame through the unit main body; and the driving mechanism drives the gate unit to move into the working gate position along the buffer frame. After the gate is put into use, the load borne by the gate in the opening and closing process is the dead weight of a single gate unit, other extra equipment is not needed in the transferring and assembling process, the whole assembling and disassembling process is simple, convenient and efficient, and a concrete foundation cannot be damaged.
本发明提供了一种蓄水挡潮闸门系统,包括底板、工作闸位、缓存架、闸门单元和驱动机构;工作闸位包括定位框和升降机构,工作闸位设置于底板上,升降机构设置于定位框外;缓存架设置于底板上;闸门单元包括单元主体和导向台,导向台设置于单元主体外,闸门单元以其单元主体暂存于缓存架上;驱动机构带动闸门单元沿缓存架移动进入工作闸位。投入使用后,闸门开闭过程中承受的载荷为单块闸门单元的自重,并且转运、装配过程中无需用到其它额外的设备,整个装卸过程简便高效,也不会对混凝土基础产生损毁。
Water storage tide gate system
一种蓄水挡潮闸门系统
ZHAO MINGYAN (Autor:in) / ZHANG TIEZHONG (Autor:in) / YIN JUNQIANG (Autor:in) / ZHANG HE (Autor:in) / ZHAO YANBIN (Autor:in) / CHEN LIN (Autor:in) / GU CHUNMAO (Autor:in) / ZHANG HONGYONG (Autor:in) / QIU TAO (Autor:in) / WANG JUN (Autor:in)
01.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Europäisches Patentamt | 2024
|TIDE GATE CONTROL APPARATUS, TIDE GATE CONTROL METHOD, AND PROGRAM
Europäisches Patentamt | 2018
|