Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flexible treatment method for karst collapse
The invention relates to the technical field of geological environment restoration. The karst collapse flexible treatment method comprises the following steps that S1, clearing is conducted, specifically, broken rock-soil bodies on the periphery of a collapse pit are cleared; s2, dumping and filling the gabions: dumping and filling the gabions into the collapse pit, and enabling the gabions to fall to the narrowest position of the collapse pit, so that the gabions deform and are clamped at the narrowest position of the collapse pit; the collapse pit is backfilled with gravel units, the gabions are filled with the gravel units, and the collapse pit is backfilled upwards; s5, backfilling and covering the foreign soil: covering the surface of the collapse pit with the foreign soil; s6, planting, wherein plants are planted on the covering soil. According to the scheme, the problem that safety risks exist on workers due to the fact that workers need to go deep into a collapse pit for operation in a traditional collapse pit treatment method is mainly solved.
本发明涉及地质环境修复的技术领域。公开了一种岩溶塌陷柔性治理方法,包括以下步骤:S1清除:清除塌陷坑四周的碎裂岩土体;S2抛填石笼:向塌陷坑内抛填石笼,石笼下坠至塌陷坑的宽度最窄处,使得石笼形变卡在塌陷坑的宽度最窄处;S3回填碎石:向塌陷坑内回填碎石单元,使其填满石笼并向上回填塌陷坑;S5回填覆客土:采用覆客土覆盖塌陷坑的表面;S6种植:在覆客土上种植植物。本方案主要解决了传统塌陷坑的治理方法需要人工深入塌陷坑内作业,对工作人员存在安全风险的问题。
Flexible treatment method for karst collapse
The invention relates to the technical field of geological environment restoration. The karst collapse flexible treatment method comprises the following steps that S1, clearing is conducted, specifically, broken rock-soil bodies on the periphery of a collapse pit are cleared; s2, dumping and filling the gabions: dumping and filling the gabions into the collapse pit, and enabling the gabions to fall to the narrowest position of the collapse pit, so that the gabions deform and are clamped at the narrowest position of the collapse pit; the collapse pit is backfilled with gravel units, the gabions are filled with the gravel units, and the collapse pit is backfilled upwards; s5, backfilling and covering the foreign soil: covering the surface of the collapse pit with the foreign soil; s6, planting, wherein plants are planted on the covering soil. According to the scheme, the problem that safety risks exist on workers due to the fact that workers need to go deep into a collapse pit for operation in a traditional collapse pit treatment method is mainly solved.
本发明涉及地质环境修复的技术领域。公开了一种岩溶塌陷柔性治理方法,包括以下步骤:S1清除:清除塌陷坑四周的碎裂岩土体;S2抛填石笼:向塌陷坑内抛填石笼,石笼下坠至塌陷坑的宽度最窄处,使得石笼形变卡在塌陷坑的宽度最窄处;S3回填碎石:向塌陷坑内回填碎石单元,使其填满石笼并向上回填塌陷坑;S5回填覆客土:采用覆客土覆盖塌陷坑的表面;S6种植:在覆客土上种植植物。本方案主要解决了传统塌陷坑的治理方法需要人工深入塌陷坑内作业,对工作人员存在安全风险的问题。
Flexible treatment method for karst collapse
一种岩溶塌陷柔性治理方法
LI MANYI (Autor:in) / SI HONGTAO (Autor:in) / MA LEI (Autor:in) / LI SHAOHUA (Autor:in) / FENG FAN (Autor:in) / ZHONG MINGYANG (Autor:in) / ZHU DONGXUE (Autor:in) / YANG XIANGDONG (Autor:in)
04.03.2022
Patent
Elektronische Ressource
Chinesisch
Roadbed karst collapse comprehensive renovation method
Europäisches Patentamt | 2020
|Design against collapse of karst caverns
British Library Conference Proceedings | 1995
|Europäisches Patentamt | 2021
|Treatment method of covered type karst region ground collapse based on geotextile
Europäisches Patentamt | 2020
|