Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ultrahigh-structure formwork erecting construction platform and implementation method thereof
The invention provides an ultrahigh structure formwork erecting construction platform and an implementation method thereof.The ultrahigh structure formwork erecting construction platform comprises a plurality of lower vertical structures, each lower vertical structure is provided with a high-altitude support, each high-altitude support is provided with a plurality of first Bailey sets, each first Bailey set is provided with a second Bailey set, and each second Bailey set is provided with a plurality of second Bailey sets; beam bottom construction platforms are arranged on the top faces of the second bailey sets, conversion platforms arranged on the second bailey sets in a supported mode are arranged between the adjacent second bailey sets, beam bottom formwork supports are arranged on the beam bottom construction platforms in a supported mode, plate bottom formwork supports are arranged on the conversion platforms in a supported mode, and beam plate forming dies are arranged on the tops of the beam bottom formwork supports and the tops of the plate bottom formwork supports. An upper beam plate is formed in the beam plate forming die. According to the ultrahigh structure formwork erecting construction platform, a reliable structure formwork erecting system foundation is formed at the high altitude through the beam bottom construction platform and the conversion platform, and the problems that in the prior art, the construction cost is high, many adverse factors exist, and the construction efficiency is low are solved.
本发明提供了一种超高结构支模施工平台及其实施方法,一种超高结构支模施工平台,包括多个下部竖向结构,每个下部竖向结构上均设置有高空支座,高空支座上设置有多个第一道贝雷组,第一道贝雷组上设置有第二道贝雷组,第二道贝雷组的顶面上设置有梁底施工平台,相邻的第二道贝雷组之间设置有支设于其上的转换平台,梁底施工平台上支设有梁底模板支架,转换平台上支设有板底模板支架,梁底模板支架和板底模板支架的顶部设置有梁板成形模,梁板成形模中成形有上部梁板。本超高结构支模施工平台利用梁底施工平台和转换平台在高空形成一个可靠的结构支模体系基础,解决了现有技术中存在的施工成本高、不利因素多、施工效率低等问题。
Ultrahigh-structure formwork erecting construction platform and implementation method thereof
The invention provides an ultrahigh structure formwork erecting construction platform and an implementation method thereof.The ultrahigh structure formwork erecting construction platform comprises a plurality of lower vertical structures, each lower vertical structure is provided with a high-altitude support, each high-altitude support is provided with a plurality of first Bailey sets, each first Bailey set is provided with a second Bailey set, and each second Bailey set is provided with a plurality of second Bailey sets; beam bottom construction platforms are arranged on the top faces of the second bailey sets, conversion platforms arranged on the second bailey sets in a supported mode are arranged between the adjacent second bailey sets, beam bottom formwork supports are arranged on the beam bottom construction platforms in a supported mode, plate bottom formwork supports are arranged on the conversion platforms in a supported mode, and beam plate forming dies are arranged on the tops of the beam bottom formwork supports and the tops of the plate bottom formwork supports. An upper beam plate is formed in the beam plate forming die. According to the ultrahigh structure formwork erecting construction platform, a reliable structure formwork erecting system foundation is formed at the high altitude through the beam bottom construction platform and the conversion platform, and the problems that in the prior art, the construction cost is high, many adverse factors exist, and the construction efficiency is low are solved.
本发明提供了一种超高结构支模施工平台及其实施方法,一种超高结构支模施工平台,包括多个下部竖向结构,每个下部竖向结构上均设置有高空支座,高空支座上设置有多个第一道贝雷组,第一道贝雷组上设置有第二道贝雷组,第二道贝雷组的顶面上设置有梁底施工平台,相邻的第二道贝雷组之间设置有支设于其上的转换平台,梁底施工平台上支设有梁底模板支架,转换平台上支设有板底模板支架,梁底模板支架和板底模板支架的顶部设置有梁板成形模,梁板成形模中成形有上部梁板。本超高结构支模施工平台利用梁底施工平台和转换平台在高空形成一个可靠的结构支模体系基础,解决了现有技术中存在的施工成本高、不利因素多、施工效率低等问题。
Ultrahigh-structure formwork erecting construction platform and implementation method thereof
一种超高结构支模施工平台及其实施方法
LIN SHOUZHONG (Autor:in) / LIN ZIJUN (Autor:in) / LU JIANLIANG (Autor:in) / FU XIAOXIAN (Autor:in) / MA WEIWEI (Autor:in) / YE FAN (Autor:in) / DONG YONGGANG (Autor:in) / WANG JIANNAN (Autor:in) / DONG XIAOFENG (Autor:in) / LIN LU (Autor:in)
04.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork erecting structure and construction method thereof
Europäisches Patentamt | 2023
|Formwork erecting and maintaining integrated formwork and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Building cornice integrated formwork erecting structure and formwork erecting method
Europäisches Patentamt | 2023
|