Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
一种雨水管线沟槽的施工方法及其沉降分析方法
本发明涉及一种雨水管线沟槽的施工方法及其沉降分析方法,预处理单元基于同区域地层沉降的样本信息建立预设沟槽沉降深度与时间相关的第一沉降曲线,在间隔布设于雨水管路上监测单元定期获取到不同区段雨水管路跟随沟槽所发生的与时间相关的沉降信息的情况下,处理单元依据采集的沉降信息建立实时的预设沟槽沉降深度与时间相关的第二沉降曲线,在处理单元建立的第二沉降曲线与其接收到的所述第一沉降曲线存在差异的情况下,处理单元以更新所述预设沟槽沉降深度的方式来更新第二沉降曲线并判断雨水管路随时间而发生的异常沉降情况,使得显示端能够根据接收到的第一沉降曲线、第二沉降曲线以及异常沉降情况分析不同区段雨水管路的完好程度。
The invention relates to a construction method and a settlement analysis method of a rainwater pipeline groove. A preprocessing unit establishes a first settlement curve related to preset groove settlement depth and time based on sample information of stratum settlement in the same area; under the condition that the monitoring units distributed on the rainwater pipeline at intervals regularly obtain time-related settlement information of the rainwater pipeline in different sections along with the groove, the processing unit establishes a real-time second settlement curve of preset groove settlement depth and time related according to the collected settlement information; under the condition that a second settlement curve established by the processing unit is different from the first settlement curve received by the processing unit, the processing unit updates the second settlement curve in a mode of updating the preset groove settlement depth and judges the abnormal settlement condition of the rainwater pipeline along with time; and the display end can analyze the intact degree of the rainwater pipeline in different sections according to the received first settlement curve, the second settlement curve and the abnormal settlement condition.
一种雨水管线沟槽的施工方法及其沉降分析方法
本发明涉及一种雨水管线沟槽的施工方法及其沉降分析方法,预处理单元基于同区域地层沉降的样本信息建立预设沟槽沉降深度与时间相关的第一沉降曲线,在间隔布设于雨水管路上监测单元定期获取到不同区段雨水管路跟随沟槽所发生的与时间相关的沉降信息的情况下,处理单元依据采集的沉降信息建立实时的预设沟槽沉降深度与时间相关的第二沉降曲线,在处理单元建立的第二沉降曲线与其接收到的所述第一沉降曲线存在差异的情况下,处理单元以更新所述预设沟槽沉降深度的方式来更新第二沉降曲线并判断雨水管路随时间而发生的异常沉降情况,使得显示端能够根据接收到的第一沉降曲线、第二沉降曲线以及异常沉降情况分析不同区段雨水管路的完好程度。
The invention relates to a construction method and a settlement analysis method of a rainwater pipeline groove. A preprocessing unit establishes a first settlement curve related to preset groove settlement depth and time based on sample information of stratum settlement in the same area; under the condition that the monitoring units distributed on the rainwater pipeline at intervals regularly obtain time-related settlement information of the rainwater pipeline in different sections along with the groove, the processing unit establishes a real-time second settlement curve of preset groove settlement depth and time related according to the collected settlement information; under the condition that a second settlement curve established by the processing unit is different from the first settlement curve received by the processing unit, the processing unit updates the second settlement curve in a mode of updating the preset groove settlement depth and judges the abnormal settlement condition of the rainwater pipeline along with time; and the display end can analyze the intact degree of the rainwater pipeline in different sections according to the received first settlement curve, the second settlement curve and the abnormal settlement condition.
一种雨水管线沟槽的施工方法及其沉降分析方法
27.05.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung