Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for underground building composed of sinking wall foundation
The invention discloses a construction method for an underground building composed of a sinking wall foundation, and relates to the technical field of underground building construction.The building located underground comprises the sinking wall foundation, groove piles, a top plate, a bottom plate, a connecting body and a construction device; the sinking wall foundation is an outer wall which is formed by combining an under-wall strip-shaped foundation, an underground diaphragm wall and a structural outer wall of a building and directly sinks in place without digging a foundation pit after construction is completed on the ground, the adjacent outer walls are connected through groove piles, and the adjacent groove piles and the outer walls are directly subjected to sinking wall construction on the ground after construction of the groove piles is completed firstly. The construction device comprises a wall construction device and a pile sinking device, the hanging device is used for hanging the outer wall, the bottom excavating device is used for excavating rock soil at the bottom of the outer wall, the excavated rock soil is unearthed through an unearthed groove, the outer wall sinks to a set position, the rock soil in the unearthed groove is cleaned, a connecting body is poured, and then follow-up construction is conducted till all construction of a building is completed.
本发明公开了用于由沉墙基础组成的地下建筑的施工法,涉及地下建筑施工技术领域,位于地下的建筑包括沉墙基础、槽桩、顶板、底板、连接体和施工装置,沉墙基础就是建筑的墙下条形基础、地下连续墙和结构外墙三墙合一的在地面完成施工后,不挖基坑直接下沉到位的外墙,相邻的外墙通过槽桩连接,相邻的槽桩和外墙是先完成槽桩的施工后,再在地面上直接进行外墙的沉墙施工,施工装置包括墙施工装置和沉桩装置,吊挂装置吊挂外墙,底部挖掘装置挖掘外墙底部的岩土,已挖掘的岩土通过出土槽进行出土,外墙下沉至设定的位置,清理出土槽中的岩土,浇筑连接体,再进行后续施工,直至完成建筑的全部施工。
Construction method for underground building composed of sinking wall foundation
The invention discloses a construction method for an underground building composed of a sinking wall foundation, and relates to the technical field of underground building construction.The building located underground comprises the sinking wall foundation, groove piles, a top plate, a bottom plate, a connecting body and a construction device; the sinking wall foundation is an outer wall which is formed by combining an under-wall strip-shaped foundation, an underground diaphragm wall and a structural outer wall of a building and directly sinks in place without digging a foundation pit after construction is completed on the ground, the adjacent outer walls are connected through groove piles, and the adjacent groove piles and the outer walls are directly subjected to sinking wall construction on the ground after construction of the groove piles is completed firstly. The construction device comprises a wall construction device and a pile sinking device, the hanging device is used for hanging the outer wall, the bottom excavating device is used for excavating rock soil at the bottom of the outer wall, the excavated rock soil is unearthed through an unearthed groove, the outer wall sinks to a set position, the rock soil in the unearthed groove is cleaned, a connecting body is poured, and then follow-up construction is conducted till all construction of a building is completed.
本发明公开了用于由沉墙基础组成的地下建筑的施工法,涉及地下建筑施工技术领域,位于地下的建筑包括沉墙基础、槽桩、顶板、底板、连接体和施工装置,沉墙基础就是建筑的墙下条形基础、地下连续墙和结构外墙三墙合一的在地面完成施工后,不挖基坑直接下沉到位的外墙,相邻的外墙通过槽桩连接,相邻的槽桩和外墙是先完成槽桩的施工后,再在地面上直接进行外墙的沉墙施工,施工装置包括墙施工装置和沉桩装置,吊挂装置吊挂外墙,底部挖掘装置挖掘外墙底部的岩土,已挖掘的岩土通过出土槽进行出土,外墙下沉至设定的位置,清理出土槽中的岩土,浇筑连接体,再进行后续施工,直至完成建筑的全部施工。
Construction method for underground building composed of sinking wall foundation
用于由沉墙基础组成的地下建筑的施工法
WANG SHUSHENG (Autor:in)
11.03.2022
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR UNDERGROUND BUILDING CONSISTING OF SINKING WALL FOUNDATION
Europäisches Patentamt | 2023
|Construction method for subsection sinking of underground building composed of connecting piles
Europäisches Patentamt | 2022
|Fan cylindrical foundation composed of underground diaphragm wall and construction method
Europäisches Patentamt | 2021
|Sinking construction device for fabricated underground building
Europäisches Patentamt | 2021
|Sinking wall foundation and construction device thereof
Europäisches Patentamt | 2022
|