Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Load reduction ecological bank protection structure for river and lake embankment reinforcement and construction method
The invention discloses a deloading ecological bank protection structure for river and lake embankment reinforcement and a construction method.The bank protection structure is arranged on the side, away from a riverway, of an original bank protection and comprises the original bank protection, a heightened embankment arranged on the side, away from the riverway, of the original bank protection and located below the heightened embankment, and reinforcing piles arranged on the side, away from the riverway, of the original bank protection and located below the heightened embankment; according to the load reduction ecological bank protection structure for river and lake embankment reinforcement, a safe and reliable embankment structure is formed through embankment building, heightening and thickening and load reduction behind the wall, the overall structure is compact in arrangement, land is effectively saved, meanwhile, by combining construction of a coastal green corridor footpath, the construction cost is reduced, and the construction efficiency is improved. The revetment is reserved and utilized, funds are saved, energy is saved, emission is reduced, construction influences such as heavy excavation and hammering vibration are avoided, and the method is suitable for urban construction.
本发明公开了一种用于河湖堤防加固的减载生态护岸结构及施工方法,护岸结构设置在原有护岸远离河道的一侧,护岸结构包括:原有护岸,加高堤防,加高堤防设置在原有护岸远离河道的一侧,位于加高堤防下方,加固桩,加固桩设置在墙后填土内部,道路,道路设置在加高堤防的上方,该用于河湖堤防加固的减载生态护岸结构,通过筑堤加高培厚和墙后减载,形成安全可靠的堤防结构,整体结构布置紧凑,有效节约土地,同时结合建设沿岸绿廊步道,亲水观景效果良好既保留利用护岸,节约资金、节能减排,又避免大开挖、锤击震动等施工影响,适应城区施工。
Load reduction ecological bank protection structure for river and lake embankment reinforcement and construction method
The invention discloses a deloading ecological bank protection structure for river and lake embankment reinforcement and a construction method.The bank protection structure is arranged on the side, away from a riverway, of an original bank protection and comprises the original bank protection, a heightened embankment arranged on the side, away from the riverway, of the original bank protection and located below the heightened embankment, and reinforcing piles arranged on the side, away from the riverway, of the original bank protection and located below the heightened embankment; according to the load reduction ecological bank protection structure for river and lake embankment reinforcement, a safe and reliable embankment structure is formed through embankment building, heightening and thickening and load reduction behind the wall, the overall structure is compact in arrangement, land is effectively saved, meanwhile, by combining construction of a coastal green corridor footpath, the construction cost is reduced, and the construction efficiency is improved. The revetment is reserved and utilized, funds are saved, energy is saved, emission is reduced, construction influences such as heavy excavation and hammering vibration are avoided, and the method is suitable for urban construction.
本发明公开了一种用于河湖堤防加固的减载生态护岸结构及施工方法,护岸结构设置在原有护岸远离河道的一侧,护岸结构包括:原有护岸,加高堤防,加高堤防设置在原有护岸远离河道的一侧,位于加高堤防下方,加固桩,加固桩设置在墙后填土内部,道路,道路设置在加高堤防的上方,该用于河湖堤防加固的减载生态护岸结构,通过筑堤加高培厚和墙后减载,形成安全可靠的堤防结构,整体结构布置紧凑,有效节约土地,同时结合建设沿岸绿廊步道,亲水观景效果良好既保留利用护岸,节约资金、节能减排,又避免大开挖、锤击震动等施工影响,适应城区施工。
Load reduction ecological bank protection structure for river and lake embankment reinforcement and construction method
一种用于河湖堤防加固的减载生态护岸结构及施工方法
WU FANG (Autor:in) / YU JIANZHONG (Autor:in) / SUN DENGFENG (Autor:in) / CHENG SHI (Autor:in) / WU XIAOJING (Autor:in) / MA YI (Autor:in) / ZHENG HONGWEI (Autor:in) / LI YU (Autor:in) / SUN WEN (Autor:in) / ZHU QINGHAN (Autor:in)
18.03.2022
Patent
Elektronische Ressource
Chinesisch
EMBANKMENT REINFORCEMENT STRUCTURE, AND CONSTRUCTION METHOD OF EMBANKMENT REINFORCEMENT STRUCTURE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|