Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated assembly type reinforced concrete top cover and construction method thereof
According to the prefabricated assembly type reinforced concrete top cover and the construction method thereof, the prefabricated assembly type reinforced concrete top cover is formed by connecting a plurality of door type reinforced concrete prefabricated top cover assemblies in parallel, and noise generated in a subway line is isolated from surrounding residential quarters; the height of the top cover assembly is increased in a stepped and segmented mode along with the height of the subway open section line, compared with a cast-in-place scheme, the overlapping and splicing scheme can reduce the procedures of field steel bar binding, concrete pouring and the like, the construction period is shortened, the influence on the surrounding environment is reduced, and high quality can be guaranteed through factory prefabricated parts.
一种预制拼装式钢筋混凝土顶盖及其施工方法,预制拼装式钢筋混凝土顶盖由若干门式钢筋混凝土预制的顶盖组件并联组成,将地铁线路内部产生的噪音与周围居住小区隔离,其中顶盖组件的高度随着地铁敞口段线路的高度而呈阶梯式分段提升,用叠合拼装的方案比现浇方案能够减少现场钢筋绑扎和浇筑混凝土等工序,缩短施工工期,减少对周边环境的影响,工厂预制构件能够保证较高的质量。
Prefabricated assembly type reinforced concrete top cover and construction method thereof
According to the prefabricated assembly type reinforced concrete top cover and the construction method thereof, the prefabricated assembly type reinforced concrete top cover is formed by connecting a plurality of door type reinforced concrete prefabricated top cover assemblies in parallel, and noise generated in a subway line is isolated from surrounding residential quarters; the height of the top cover assembly is increased in a stepped and segmented mode along with the height of the subway open section line, compared with a cast-in-place scheme, the overlapping and splicing scheme can reduce the procedures of field steel bar binding, concrete pouring and the like, the construction period is shortened, the influence on the surrounding environment is reduced, and high quality can be guaranteed through factory prefabricated parts.
一种预制拼装式钢筋混凝土顶盖及其施工方法,预制拼装式钢筋混凝土顶盖由若干门式钢筋混凝土预制的顶盖组件并联组成,将地铁线路内部产生的噪音与周围居住小区隔离,其中顶盖组件的高度随着地铁敞口段线路的高度而呈阶梯式分段提升,用叠合拼装的方案比现浇方案能够减少现场钢筋绑扎和浇筑混凝土等工序,缩短施工工期,减少对周边环境的影响,工厂预制构件能够保证较高的质量。
Prefabricated assembly type reinforced concrete top cover and construction method thereof
一种预制拼装式钢筋混凝土顶盖及其施工方法
HE GUANHONG (Autor:in) / MINAMI HARUKO (Autor:in) / MAI JIA'ER (Autor:in) / NONG XINGZHONG (Autor:in) / LIU JIANMEI (Autor:in) / ZHENG CONG (Autor:in)
18.03.2022
Patent
Elektronische Ressource
Chinesisch
Reinforced concrete prefabricated cover plate and construction method thereof
Europäisches Patentamt | 2023
|Prefabricated assembly type reinforced concrete retaining wall and construction method thereof
Europäisches Patentamt | 2023
|Assembly type prefabricated reinforced concrete combined pier and construction method thereof
Europäisches Patentamt | 2020
|Assembly type prefabricated reinforced concrete prefabricated part
Europäisches Patentamt | 2021
|Prefabricated assembly type reinforced concrete bridge stop block and construction method thereof
Europäisches Patentamt | 2023
|