Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Open-close type gabion underwater construction method
The invention discloses an opening and closing type gabion underwater construction method, relates to the technical field of gabion underwater installation auxiliary devices, and aims to solve the problems that an existing gabion is low in underwater construction speed, high in cost and high in difficulty. The method comprises the steps that firstly, a gabion is placed in a gabion containing cavity in a device body in a dry environment, at the moment, a bottom turning plate at the bottom of the device body is located in a closed device, and then the gabion is filled with a proper amount of stone; secondly, after filling is completed, the second sling is lifted preferentially through the crane, and then the device body is lifted through the first sling and moves towards the designated position; and thirdly, after the device reaches the designated position, a first sling is arranged below the device, the device containing the gabions and the stones is hoisted to the underwater position, a second sling is gradually loosened by the crane, and after a second lifting lug loses tension, one end of a bottom turning plate gradually rotates around the axis of a hinge, so that a gabion lowering opening is opened, and the gabions sink to the water bottom under the action of gravity.
本发明公开了一种启闭型石笼水下施工方法,涉及石笼水下安装辅助装置技术领域,为解决现有的石笼在水下施工速度慢,成本大以及难度高的问题。步骤一、在干性环境将石笼放置于装置主体内部的石笼放置腔中,此时装置主体底部的底翻板处于闭合装置,随后朝石笼中填充适量的石块;步骤二、填充完成后,通过吊车优先抬升第二吊索,随后通过第一吊索对装置主体进行抬升,并朝指定位置进行移动;步骤三、到达指定位置后,下方第一吊索,令装有石笼及石块的该装置吊装到水下部位后,吊车逐渐放松第二吊索,第二吊耳在失去拉力后底翻板的一端逐渐以铰链的轴心进行旋转,从而使得石笼下放口打开,石笼在重力作用下下沉至水底。
Open-close type gabion underwater construction method
The invention discloses an opening and closing type gabion underwater construction method, relates to the technical field of gabion underwater installation auxiliary devices, and aims to solve the problems that an existing gabion is low in underwater construction speed, high in cost and high in difficulty. The method comprises the steps that firstly, a gabion is placed in a gabion containing cavity in a device body in a dry environment, at the moment, a bottom turning plate at the bottom of the device body is located in a closed device, and then the gabion is filled with a proper amount of stone; secondly, after filling is completed, the second sling is lifted preferentially through the crane, and then the device body is lifted through the first sling and moves towards the designated position; and thirdly, after the device reaches the designated position, a first sling is arranged below the device, the device containing the gabions and the stones is hoisted to the underwater position, a second sling is gradually loosened by the crane, and after a second lifting lug loses tension, one end of a bottom turning plate gradually rotates around the axis of a hinge, so that a gabion lowering opening is opened, and the gabions sink to the water bottom under the action of gravity.
本发明公开了一种启闭型石笼水下施工方法,涉及石笼水下安装辅助装置技术领域,为解决现有的石笼在水下施工速度慢,成本大以及难度高的问题。步骤一、在干性环境将石笼放置于装置主体内部的石笼放置腔中,此时装置主体底部的底翻板处于闭合装置,随后朝石笼中填充适量的石块;步骤二、填充完成后,通过吊车优先抬升第二吊索,随后通过第一吊索对装置主体进行抬升,并朝指定位置进行移动;步骤三、到达指定位置后,下方第一吊索,令装有石笼及石块的该装置吊装到水下部位后,吊车逐渐放松第二吊索,第二吊耳在失去拉力后底翻板的一端逐渐以铰链的轴心进行旋转,从而使得石笼下放口打开,石笼在重力作用下下沉至水底。
Open-close type gabion underwater construction method
一种启闭型石笼水下施工方法
ZHANG SHAOHUA (Autor:in) / CHEN DONG (Autor:in) / ZHANG YANXIA (Autor:in) / XU WENJUN (Autor:in) / CHENG XIAOMING (Autor:in) / GAO JING (Autor:in) / CHEN ZHIHAI (Autor:in) / WANG JINGYUN (Autor:in) / XU TAO (Autor:in) / WEI YINGTANG (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen