Flood prevention and drainage pump station structure
The invention provides a flood prevention and drainage pump station structure which comprises a water inlet area, a partition plate is installed in the water inlet area, the water inlet area is divided into an upper area and a lower area through the partition plate, and flood water is gathered to the position below the partition plate after being subjected to sedimentation and extrusion mechanism treatment; the speed measuring mechanism is installed in the water inlet pipe and used for detecting the flow speed of the flood water passing through the water inlet pipe and measuring the flow speed of the flood water through contact between an elastic rope and a feeler lever, and a sensor in the feeler lever is electrically connected with the automatic valve and the valve; the pump room is connected with the other side of the water inlet area through a connecting water pipe, one end of the connecting water pipe penetrates through the pump room and is connected with the water outlet area, a water outlet pipe is installed on one side of the water outlet area, an automatic valve, a manual valve and a water pump are sequentially installed on the connecting water pipe and located in the pump room, and a cover plate is hinged to the top end of the pump room; and the alarm is mounted above the water inlet area, and the alarm is electrically connected with the sensor in the feeler lever.
本发明提供一种防汛排涝泵站结构,包括进水区,其内安装有隔板,通过隔板将进水区分为上、下两个区域,洪涝水经过沉淀、挤压机构处理后聚集至隔板的下方;测速机构,其安装在进水管内,用于检测通过进水管的洪涝水的流速,通过弹力绳和触杆的碰触,测得洪涝水的流速,触杆内的传感器分别和自动阀门、阀门电连接;泵房,其通过连接水管和进水区另一侧连接,连接水管一端穿过泵房和出水区连接,出水区一侧安装有出水管,连接水管上依次安装有自动阀门、手动阀门和水泵,且自动阀门、手动阀门和水泵均位于泵房内,泵房顶端铰接有盖板;警报器,其安装在进水区上方,警报器和触杆内的传感器电连接。
Flood prevention and drainage pump station structure
The invention provides a flood prevention and drainage pump station structure which comprises a water inlet area, a partition plate is installed in the water inlet area, the water inlet area is divided into an upper area and a lower area through the partition plate, and flood water is gathered to the position below the partition plate after being subjected to sedimentation and extrusion mechanism treatment; the speed measuring mechanism is installed in the water inlet pipe and used for detecting the flow speed of the flood water passing through the water inlet pipe and measuring the flow speed of the flood water through contact between an elastic rope and a feeler lever, and a sensor in the feeler lever is electrically connected with the automatic valve and the valve; the pump room is connected with the other side of the water inlet area through a connecting water pipe, one end of the connecting water pipe penetrates through the pump room and is connected with the water outlet area, a water outlet pipe is installed on one side of the water outlet area, an automatic valve, a manual valve and a water pump are sequentially installed on the connecting water pipe and located in the pump room, and a cover plate is hinged to the top end of the pump room; and the alarm is mounted above the water inlet area, and the alarm is electrically connected with the sensor in the feeler lever.
本发明提供一种防汛排涝泵站结构,包括进水区,其内安装有隔板,通过隔板将进水区分为上、下两个区域,洪涝水经过沉淀、挤压机构处理后聚集至隔板的下方;测速机构,其安装在进水管内,用于检测通过进水管的洪涝水的流速,通过弹力绳和触杆的碰触,测得洪涝水的流速,触杆内的传感器分别和自动阀门、阀门电连接;泵房,其通过连接水管和进水区另一侧连接,连接水管一端穿过泵房和出水区连接,出水区一侧安装有出水管,连接水管上依次安装有自动阀门、手动阀门和水泵,且自动阀门、手动阀门和水泵均位于泵房内,泵房顶端铰接有盖板;警报器,其安装在进水区上方,警报器和触杆内的传感器电连接。
Flood prevention and drainage pump station structure
一种防汛排涝泵站结构
WEI CHENGLUAN (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Flood drainage pump station and rolling cleaning structure thereof
Europäisches Patentamt | 2023
|Substation flood prevention emergency drainage pump device