Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Strip mine field
The embodiment of the invention provides an open-pit mine field, relates to the technical field of mining, and aims to solve the problem of low drainage capacity of the open-pit mine field in related technologies. The strip mine field comprises an end slope; a plurality of water collecting wells are arranged in the peripheral direction of the edge area of the end slope at intervals; the end slope is further provided with a plurality of end slope steps, the end slope step located at the bottom of the end slope is a first end slope step, the first end slope step comprises a first upper flat plate and a first slope surface, a first water collecting ditch is formed in the end, away from the first upper flat plate, of the first slope surface, and the first water collecting ditch is connected with the water collecting well through a first drainage pipe; the end, close to the first water collecting ditch, of the first drainage pipe is higher than the end, away from the first water collecting ditch, of the first drainage pipe. A porous sleeve is arranged in each water collecting well, and a water pump is arranged in each porous sleeve.
本申请实施例提供了一种露天矿场,涉及采矿技术领域,以改善相关技术中露天矿场的排水能力不高的问题。所述露天矿场包括:端帮;端帮的边缘区域周向间隔设置有多个集水井;端帮还设置有多个端帮台阶,其中,位于端帮的底部的端帮台阶为第一端帮台阶,第一端帮台阶包括第一上平盘和第一坡面,第一坡面的远离第一上平盘的一端设置有第一集水沟,第一集水沟通过第一引流管与集水井连接,第一引流管倾斜设置,第一引流管的靠近第一集水沟的端部高于第一引流管的远离第一集水沟的端部;每个集水井内均设置有多孔套管,每个多孔套管内均设置有水泵。
Strip mine field
The embodiment of the invention provides an open-pit mine field, relates to the technical field of mining, and aims to solve the problem of low drainage capacity of the open-pit mine field in related technologies. The strip mine field comprises an end slope; a plurality of water collecting wells are arranged in the peripheral direction of the edge area of the end slope at intervals; the end slope is further provided with a plurality of end slope steps, the end slope step located at the bottom of the end slope is a first end slope step, the first end slope step comprises a first upper flat plate and a first slope surface, a first water collecting ditch is formed in the end, away from the first upper flat plate, of the first slope surface, and the first water collecting ditch is connected with the water collecting well through a first drainage pipe; the end, close to the first water collecting ditch, of the first drainage pipe is higher than the end, away from the first water collecting ditch, of the first drainage pipe. A porous sleeve is arranged in each water collecting well, and a water pump is arranged in each porous sleeve.
本申请实施例提供了一种露天矿场,涉及采矿技术领域,以改善相关技术中露天矿场的排水能力不高的问题。所述露天矿场包括:端帮;端帮的边缘区域周向间隔设置有多个集水井;端帮还设置有多个端帮台阶,其中,位于端帮的底部的端帮台阶为第一端帮台阶,第一端帮台阶包括第一上平盘和第一坡面,第一坡面的远离第一上平盘的一端设置有第一集水沟,第一集水沟通过第一引流管与集水井连接,第一引流管倾斜设置,第一引流管的靠近第一集水沟的端部高于第一引流管的远离第一集水沟的端部;每个集水井内均设置有多孔套管,每个多孔套管内均设置有水泵。
Strip mine field
一种露天矿场
LIU XIANBIAO (Autor:in) / CHENG WENFU (Autor:in) / YANG QINGLONG (Autor:in) / ZHAO QINGLONG (Autor:in) / LIU ZHONGWEI (Autor:in) / WU CHANGSHUAI (Autor:in) / LI SHOULIANG (Autor:in) / WANG YU (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Engineering Index Backfile | 1953
Noise control of strip mine vehicles
Tema Archiv | 1975
|