Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for steel reinforced concrete batter post of underground structure
The invention discloses an underground structure steel reinforced concrete batter post construction method, and relates to the technical field of steel reinforced concrete construction, and the method comprises the following steps: S1, measurement positioning, S2, pretreatment, S3, batter post middle section profile steel installation, S4, batter post middle section steel bar installation, S5, batter post middle section template installation, and S6, batter post middle section concrete pouring. The construction method is suitable for mounting the steel reinforced concrete combined batter posts with different inclination angles, and particularly has universality for the steel reinforced concrete combined batter posts with a large number and different inclination angles in some large underground structures.
本发明公开了一种地下结构型钢混凝土斜柱施工方法,涉及型钢混凝土施工技术领域,所述方法包括以下步骤:S1:测量定位、S2:预处理、S3:斜柱中间段型钢安装、S4:斜柱中间段钢筋安装、S5:斜柱中间段模板安装、S6:斜柱中间段混凝土浇筑。本发明所述施工方法适用于安装不同倾斜角度的型钢混凝土组合斜柱,尤其对于一些大型地下结构中数量较多且倾角各异的型钢混凝土组合斜柱具有普适性。
Construction method for steel reinforced concrete batter post of underground structure
The invention discloses an underground structure steel reinforced concrete batter post construction method, and relates to the technical field of steel reinforced concrete construction, and the method comprises the following steps: S1, measurement positioning, S2, pretreatment, S3, batter post middle section profile steel installation, S4, batter post middle section steel bar installation, S5, batter post middle section template installation, and S6, batter post middle section concrete pouring. The construction method is suitable for mounting the steel reinforced concrete combined batter posts with different inclination angles, and particularly has universality for the steel reinforced concrete combined batter posts with a large number and different inclination angles in some large underground structures.
本发明公开了一种地下结构型钢混凝土斜柱施工方法,涉及型钢混凝土施工技术领域,所述方法包括以下步骤:S1:测量定位、S2:预处理、S3:斜柱中间段型钢安装、S4:斜柱中间段钢筋安装、S5:斜柱中间段模板安装、S6:斜柱中间段混凝土浇筑。本发明所述施工方法适用于安装不同倾斜角度的型钢混凝土组合斜柱,尤其对于一些大型地下结构中数量较多且倾角各异的型钢混凝土组合斜柱具有普适性。
Construction method for steel reinforced concrete batter post of underground structure
一种地下结构型钢混凝土斜柱施工方法
DING DEZHI (Autor:in) / MA NING (Autor:in) / AI PENGPENG (Autor:in) / CHEN HANG (Autor:in) / LI RAN (Autor:in) / HUANG YONGHU (Autor:in) / TANG MONING (Autor:in) / GENG DAXIN (Autor:in) / WANG SEN (Autor:in) / ZHU XIONGTAO (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Construction method of large-diameter circular steel reinforced concrete batter post
Europäisches Patentamt | 2023
|Support-free construction method for V-shaped reinforced concrete batter post
Europäisches Patentamt | 2024
|Concrete-filled steel tube batter post node and building structure applying batter post node
Europäisches Patentamt | 2023
|Construction method of large-section concrete batter post
Europäisches Patentamt | 2024
|