Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water seepage prevention curtain wall
The invention relates to the field of water curtain wall viewing, in particular to an anti-seepage curtain wall which comprises a wall body, an upper beam is fixedly installed at the upper end of the wall body, a base is fixedly installed at the lower end of the wall body, the wall body comprises a first background plate and a second background plate, the first background plate is located indoors, and the second background plate is located outdoors. Sliding grooves are formed in the upper portion of the first background plate and the upper portion of the second background plate, sliding blocks are symmetrically arranged at the lower end of the upper beam, and the sliding blocks are in sliding connection with the sliding grooves. And then the upper beam is fixed with the first background plate and the second background plate through sliding connection between the sliding blocks and the sliding grooves, so that convenience can be provided for a worker in the curtain wall installation process, the worker is helped to save the installation time, the worker does not need to lift the whole curtain wall, the danger is reduced, and the work efficiency is improved. And the curtain wall is detachable, so that a worker can carry the curtain wall conveniently.
本发明涉及水幕墙观赏领域,具体为一种防渗水幕墙,包括墙体,所述墙体的上端固定安装有上梁,所述墙体的下端固定安装有底座,所述墙体包括第一背景板和第二背景板,所述第一背景板位于室内,所述第二背景板位于室外,所述第一背景板和第二背景板的上方均开设有滑槽,所述上梁的下端对称设置有滑块,所述滑块与滑槽滑动连接,通过将第一背景板和第二背景板插入到底座中,然后通过滑块与滑槽之间滑动连接使得上梁与第一背景板和第二背景板固定,这就可以在工作人员进行幕墙安装的途中提供便利,帮助工作人员节省安装的时间,也就不需要工作人员将幕墙整块抬起,减少了危险性,幕墙的可拆卸性方便了工作人员进行搬运。
Water seepage prevention curtain wall
The invention relates to the field of water curtain wall viewing, in particular to an anti-seepage curtain wall which comprises a wall body, an upper beam is fixedly installed at the upper end of the wall body, a base is fixedly installed at the lower end of the wall body, the wall body comprises a first background plate and a second background plate, the first background plate is located indoors, and the second background plate is located outdoors. Sliding grooves are formed in the upper portion of the first background plate and the upper portion of the second background plate, sliding blocks are symmetrically arranged at the lower end of the upper beam, and the sliding blocks are in sliding connection with the sliding grooves. And then the upper beam is fixed with the first background plate and the second background plate through sliding connection between the sliding blocks and the sliding grooves, so that convenience can be provided for a worker in the curtain wall installation process, the worker is helped to save the installation time, the worker does not need to lift the whole curtain wall, the danger is reduced, and the work efficiency is improved. And the curtain wall is detachable, so that a worker can carry the curtain wall conveniently.
本发明涉及水幕墙观赏领域,具体为一种防渗水幕墙,包括墙体,所述墙体的上端固定安装有上梁,所述墙体的下端固定安装有底座,所述墙体包括第一背景板和第二背景板,所述第一背景板位于室内,所述第二背景板位于室外,所述第一背景板和第二背景板的上方均开设有滑槽,所述上梁的下端对称设置有滑块,所述滑块与滑槽滑动连接,通过将第一背景板和第二背景板插入到底座中,然后通过滑块与滑槽之间滑动连接使得上梁与第一背景板和第二背景板固定,这就可以在工作人员进行幕墙安装的途中提供便利,帮助工作人员节省安装的时间,也就不需要工作人员将幕墙整块抬起,减少了危险性,幕墙的可拆卸性方便了工作人员进行搬运。
Water seepage prevention curtain wall
一种防渗水幕墙
LIU JIAYANG (Autor:in) / TANG YADONG (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Architectural decoration curtain wall with embedded pressurized water seepage prevention structure
Europäisches Patentamt | 2024
|Construction method for treating water seepage and water leakage of existing curtain wall
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|