Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Completely-assembled stone, glass and metal curtain wall
The invention relates to the technical field of curtain walls, and provides a complete assembly type stone, glass and metal curtain wall which comprises a main body structure wall body, a curtain wall panel, a steel stand column and a cross beam, and the steel stand column and the cross beam are connected between the main body structure wall body and the curtain wall panel and used for installing the curtain wall panel. An embedded part into which a bolt can be screwed is arranged in the main body structure wall body, an adapter piece is arranged on one side, close to the curtain wall panel, of the wall body, and the adapter piece can be an angle steel adapter piece or a processed L-shaped steel adapter piece; one end of the adapter is screwed into a thread of the embedded part through a screw rod, and the other end of the L-shaped steel adapter clamps the steel stand column and then is connected in a penetrating mode through the side end of a bolt; the fabricated curtain wall completely conforms to the index policy of the fabricated building assembly rate proposed by the country, 100% assembly is achieved from the embedded parts, the L-shaped steel connectors, the stand columns, the cross beams and the panels, fire-free assembly is completely achieved on the construction site, and the fabricated curtain wall is a real fabricated curtain wall.
本发明涉及幕墙技术领域,提供了一种完全装配式石材、玻璃、金属幕墙,包括主体结构墙体和幕墙面板,以及连接在主体结构墙体与幕墙面板之间的用于安装幕墙面板的钢立柱和横梁;所述主体结构墙体中设置有可拧入螺栓的预埋件,墙体靠近幕墙面板的一侧设置有转接件,转接件可选择角钢转接件或者经过加工处理的L形钢转接件;转接件的一端使用螺杆拧入预埋件的螺纹中,L钢转接件的另一端夹持钢立柱后使用螺栓侧端穿接;本发明完全符合国家提出的装配式建筑装配率的指标政策,从预埋件、L钢转接件、立柱、横梁、面板实现100%装配,施工现场完全做到不动火装配,是真实意义上的装配式幕墙。
Completely-assembled stone, glass and metal curtain wall
The invention relates to the technical field of curtain walls, and provides a complete assembly type stone, glass and metal curtain wall which comprises a main body structure wall body, a curtain wall panel, a steel stand column and a cross beam, and the steel stand column and the cross beam are connected between the main body structure wall body and the curtain wall panel and used for installing the curtain wall panel. An embedded part into which a bolt can be screwed is arranged in the main body structure wall body, an adapter piece is arranged on one side, close to the curtain wall panel, of the wall body, and the adapter piece can be an angle steel adapter piece or a processed L-shaped steel adapter piece; one end of the adapter is screwed into a thread of the embedded part through a screw rod, and the other end of the L-shaped steel adapter clamps the steel stand column and then is connected in a penetrating mode through the side end of a bolt; the fabricated curtain wall completely conforms to the index policy of the fabricated building assembly rate proposed by the country, 100% assembly is achieved from the embedded parts, the L-shaped steel connectors, the stand columns, the cross beams and the panels, fire-free assembly is completely achieved on the construction site, and the fabricated curtain wall is a real fabricated curtain wall.
本发明涉及幕墙技术领域,提供了一种完全装配式石材、玻璃、金属幕墙,包括主体结构墙体和幕墙面板,以及连接在主体结构墙体与幕墙面板之间的用于安装幕墙面板的钢立柱和横梁;所述主体结构墙体中设置有可拧入螺栓的预埋件,墙体靠近幕墙面板的一侧设置有转接件,转接件可选择角钢转接件或者经过加工处理的L形钢转接件;转接件的一端使用螺杆拧入预埋件的螺纹中,L钢转接件的另一端夹持钢立柱后使用螺栓侧端穿接;本发明完全符合国家提出的装配式建筑装配率的指标政策,从预埋件、L钢转接件、立柱、横梁、面板实现100%装配,施工现场完全做到不动火装配,是真实意义上的装配式幕墙。
Completely-assembled stone, glass and metal curtain wall
完全装配式石材、玻璃、金属幕墙
ZHOU BO (Autor:in) / ZHOU XIAO (Autor:in) / LIU KANGPING (Autor:in) / WANG XUELI (Autor:in) / LIAO QIJIAN (Autor:in) / DU BEIBEI (Autor:in) / LIU SHUAI (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Connecting structure of stone curtain wall and glass curtain wall
Europäisches Patentamt | 2021
|Construction method for joint of stone curtain wall and glass curtain wall
Europäisches Patentamt | 2021
|