Unidirectional laminated slab post-cast strip node structure and construction method thereof
The invention provides a one-way laminated slab post-cast strip joint structure and a construction method thereof.The one-way laminated slab post-cast strip joint structure comprises two prefabricated floor slabs, a bottom plate and additional steel bars, the prefabricated floor slabs are prefabricated parts of one-way laminated slabs, the bottom plate is arranged below an abutted seam of the two prefabricated floor slabs, the width of the bottom plate is larger than that of the abutted seam, and the additional steel bars stretch across the abutted seam; the embedded parts are embedded in the bottom face of the prefabricated floor slab, the bottom plate is provided with two rows of through holes, the through holes correspond to the embedded parts in position one to one, and the connecting parts penetrate through the through holes to be fixed to the embedded parts. The construction method comprises the steps that S1, the prefabricated floors are hoisted and placed at intervals; s2, a bottom plate is hoisted, and connecting pieces are arranged; s3, additional steel bars are arranged; s4, placing bottom full-length ribs and top full-length ribs; s5, cast-in-place concrete is poured and cured; and S, taking down the connecting piece and the bottom plate. According to the scheme, vertical supports do not need to be erected on the bottom side of the prefabricated floor slab, the installation time is short, the difficulty is low, the construction period is shortened, the construction amount is reduced, and manpower, material resources and construction time are saved.
本发明提供一种单向叠合板后浇带节点构造及其施工方法,单向叠合板后浇带节点构造包括两块预制楼板、底板和附加钢筋,预制楼板为单向叠合板的预制部分,底板设在两块预制楼板的拼缝下方且宽度大于拼缝,附加钢筋横跨拼缝,还包括预埋件和连接件,预埋件预埋在预制楼板底面,底板设两列贯通孔,贯通孔与预埋件位置一一对应,连接件穿过贯通孔与预埋件固定。施工方法包括:S1吊装预制楼板间隔放置;S2吊装底板,设置连接件;S3设附加钢筋;S4放底部通长筋和顶部通长筋;S5浇筑现浇混凝土并养护;S取下连接件和底板。本方案不需要在预制楼板的底侧搭设竖向支撑,安装时间短、难度低,缩短工期,减少施工量,节约人力物力和施工时间。
Unidirectional laminated slab post-cast strip node structure and construction method thereof
The invention provides a one-way laminated slab post-cast strip joint structure and a construction method thereof.The one-way laminated slab post-cast strip joint structure comprises two prefabricated floor slabs, a bottom plate and additional steel bars, the prefabricated floor slabs are prefabricated parts of one-way laminated slabs, the bottom plate is arranged below an abutted seam of the two prefabricated floor slabs, the width of the bottom plate is larger than that of the abutted seam, and the additional steel bars stretch across the abutted seam; the embedded parts are embedded in the bottom face of the prefabricated floor slab, the bottom plate is provided with two rows of through holes, the through holes correspond to the embedded parts in position one to one, and the connecting parts penetrate through the through holes to be fixed to the embedded parts. The construction method comprises the steps that S1, the prefabricated floors are hoisted and placed at intervals; s2, a bottom plate is hoisted, and connecting pieces are arranged; s3, additional steel bars are arranged; s4, placing bottom full-length ribs and top full-length ribs; s5, cast-in-place concrete is poured and cured; and S, taking down the connecting piece and the bottom plate. According to the scheme, vertical supports do not need to be erected on the bottom side of the prefabricated floor slab, the installation time is short, the difficulty is low, the construction period is shortened, the construction amount is reduced, and manpower, material resources and construction time are saved.
本发明提供一种单向叠合板后浇带节点构造及其施工方法,单向叠合板后浇带节点构造包括两块预制楼板、底板和附加钢筋,预制楼板为单向叠合板的预制部分,底板设在两块预制楼板的拼缝下方且宽度大于拼缝,附加钢筋横跨拼缝,还包括预埋件和连接件,预埋件预埋在预制楼板底面,底板设两列贯通孔,贯通孔与预埋件位置一一对应,连接件穿过贯通孔与预埋件固定。施工方法包括:S1吊装预制楼板间隔放置;S2吊装底板,设置连接件;S3设附加钢筋;S4放底部通长筋和顶部通长筋;S5浇筑现浇混凝土并养护;S取下连接件和底板。本方案不需要在预制楼板的底侧搭设竖向支撑,安装时间短、难度低,缩短工期,减少施工量,节约人力物力和施工时间。
Unidirectional laminated slab post-cast strip node structure and construction method thereof
单向叠合板后浇带节点构造及其施工方法
CHEN FULIANG (Autor:in) / TIAN BAOQING (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Dense-splicing laminated slab post-cast strip construction structure and construction method thereof
Europäisches Patentamt | 2024
|Laminated slab post-cast strip sealing construction method and sealing structure
Europäisches Patentamt | 2022
|Construction method for reinforcing post-cast slab strip of prefabricated laminated slab
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Laminated slab cast-in-place slab strip formwork hanging device and construction method thereof
Europäisches Patentamt | 2023
|