Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a building main body construction device, and relates to the technical field of building construction.The building main body construction device comprises a fixing assembly, a moving assembly arranged below the fixing assembly and used for moving the construction device and at least one clearing assembly for clearing the surface of a vertical reinforcing steel bar, and the fixing assembly comprises a fixing plate and a first fixing support; the first fixing support is arranged above the fixing plate and used for installing the removing assembly. The clearing assembly comprises a first clearing component, a second clearing component and a first driving component used for lifting the first clearing component, the first clearing component is used for brushing away concrete and dust adhering to the vertical steel bars, and the second clearing component is connected with the first clearing component and used for knocking the vertical steel bars. The vertical column has the advantages that concrete and dust adhering to the exposed vertical steel bars of the vertical column are reduced, and the strength of the vertical column is improved.
本申请涉及建筑主体施工装置,涉及建筑施工技术领域,其包括固定组件、设在固定组件下方用于移动施工装置的移动组件和至少一个对竖向钢筋表面进行清理的清除组件,所述固定组件包括固定板和第一固定支架,第一固定支架设在固定板上方,第一固定支架用于安装清除组件;所述清除组件包括第一清除部件、第二清除部件和用于升降第一清除部件的第一驱动部件,第一清除部件用于刷除竖向钢筋上粘附的混凝土及灰尘,第二清除部件与第一清除部件连接,第二清除部件用于敲击竖向钢筋。本申请具有减少露出的立柱的竖向钢筋上粘附的混凝土及灰尘,提高立柱强度的效果。
The invention relates to a building main body construction device, and relates to the technical field of building construction.The building main body construction device comprises a fixing assembly, a moving assembly arranged below the fixing assembly and used for moving the construction device and at least one clearing assembly for clearing the surface of a vertical reinforcing steel bar, and the fixing assembly comprises a fixing plate and a first fixing support; the first fixing support is arranged above the fixing plate and used for installing the removing assembly. The clearing assembly comprises a first clearing component, a second clearing component and a first driving component used for lifting the first clearing component, the first clearing component is used for brushing away concrete and dust adhering to the vertical steel bars, and the second clearing component is connected with the first clearing component and used for knocking the vertical steel bars. The vertical column has the advantages that concrete and dust adhering to the exposed vertical steel bars of the vertical column are reduced, and the strength of the vertical column is improved.
本申请涉及建筑主体施工装置,涉及建筑施工技术领域,其包括固定组件、设在固定组件下方用于移动施工装置的移动组件和至少一个对竖向钢筋表面进行清理的清除组件,所述固定组件包括固定板和第一固定支架,第一固定支架设在固定板上方,第一固定支架用于安装清除组件;所述清除组件包括第一清除部件、第二清除部件和用于升降第一清除部件的第一驱动部件,第一清除部件用于刷除竖向钢筋上粘附的混凝土及灰尘,第二清除部件与第一清除部件连接,第二清除部件用于敲击竖向钢筋。本申请具有减少露出的立柱的竖向钢筋上粘附的混凝土及灰尘,提高立柱强度的效果。
Building main body construction device
建筑主体施工装置
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Plastering device for building main body construction
Europäisches Patentamt | 2024
|Formwork structure for building main body structure construction
Europäisches Patentamt | 2021
|High-rise building main body interpenetrating construction process
Europäisches Patentamt | 2023
|Fabricated wallboard for building main body structure construction
Europäisches Patentamt | 2021
|Existing building main body anti-floating construction method
Europäisches Patentamt | 2021
|