Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting method of bulletproof glass
The invention discloses a bulletproof glass installation method, which belongs to the technical field of building construction, and comprises the following steps: transporting bulletproof glass to an installation site; sucking the outer side of the bullet-proof glass to be mounted by adopting a sucking disc, wherein the sucking disc is connected with a lifting hook of a crane through a lifting rope; the bulletproof glass is hoisted into the air through the crane, the space posture of the bulletproof glass is adjusted, and the lower end of the bulletproof glass is hoisted into a frame at the installation position; a first auxiliary suction cup sucks the inner side of the bulletproof glass, the first auxiliary suction cup is pulled, and the bulletproof glass is accurately put into a frame in place; and pressing the bullet-proof glass which is put into the frame in place by using a temporary pressing plate, and injecting glue for sealing. The bulletproof glass can be safely and stably installed.
本发明公开了一种防弹玻璃的安装方法,其属于建筑施工技术领域,包括以下步骤:将防弹玻璃运输至安装现场;采用吸盘吸住待安装的所述防弹玻璃的外侧,所述吸盘通过吊绳与吊机的吊钩连接;所述吊机将所述防弹玻璃吊运至空中,并调整所述防弹玻璃的空间姿态,在安装位置将所述防弹玻璃的下端吊装入框;第一辅助吸盘吸住所述防弹玻璃的内侧,拉动所述第一辅助吸盘,将所述防弹玻璃准确入框到位;用临时压板压住入框到位的所述防弹玻璃,注胶密封。本发明能够安全、稳定地完成防弹玻璃的安装。
Mounting method of bulletproof glass
The invention discloses a bulletproof glass installation method, which belongs to the technical field of building construction, and comprises the following steps: transporting bulletproof glass to an installation site; sucking the outer side of the bullet-proof glass to be mounted by adopting a sucking disc, wherein the sucking disc is connected with a lifting hook of a crane through a lifting rope; the bulletproof glass is hoisted into the air through the crane, the space posture of the bulletproof glass is adjusted, and the lower end of the bulletproof glass is hoisted into a frame at the installation position; a first auxiliary suction cup sucks the inner side of the bulletproof glass, the first auxiliary suction cup is pulled, and the bulletproof glass is accurately put into a frame in place; and pressing the bullet-proof glass which is put into the frame in place by using a temporary pressing plate, and injecting glue for sealing. The bulletproof glass can be safely and stably installed.
本发明公开了一种防弹玻璃的安装方法,其属于建筑施工技术领域,包括以下步骤:将防弹玻璃运输至安装现场;采用吸盘吸住待安装的所述防弹玻璃的外侧,所述吸盘通过吊绳与吊机的吊钩连接;所述吊机将所述防弹玻璃吊运至空中,并调整所述防弹玻璃的空间姿态,在安装位置将所述防弹玻璃的下端吊装入框;第一辅助吸盘吸住所述防弹玻璃的内侧,拉动所述第一辅助吸盘,将所述防弹玻璃准确入框到位;用临时压板压住入框到位的所述防弹玻璃,注胶密封。本发明能够安全、稳定地完成防弹玻璃的安装。
Mounting method of bulletproof glass
一种防弹玻璃的安装方法
CHEN JIAWEI (Autor:in) / JIA BAORONG (Autor:in) / LUO WEILING (Autor:in) / LIU XIAOXING (Autor:in) / LIANG XINYA (Autor:in) / LU CHUN (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Bulletproof wall composite material and bulletproof wall
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Online Contents | 1995