Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Totally-enclosed foundation pit water stop system and construction method thereof
The invention relates to a totally-enclosed foundation pit water stopping system and a construction method thereof.The totally-enclosed foundation pit water stopping system comprises a plurality of rows of secant piles which are arranged in a design area of a foundation pit and cover the design area of the foundation pit, every two adjacent secant piles are arranged in an engaged mode, and the bottom elevation of the secant piles is lower than that of the foundation pit; the waterproof curtain structure is arranged around the design area of the foundation pit, and the bottom elevation of the waterproof curtain structure is lower than that of the foundation pit. According to the method, the foundation pit is formed by digging out the part, located in the foundation pit range, of the secant pile, the remaining part of the secant pile forms a bottom sealing and water stopping structure, and underground water is effectively prevented from permeating into the foundation pit from the bottom of the foundation pit.
本发明涉及一种全封闭式基坑止水系统及其施工方法,包括:设于基坑的设计区域且覆盖基坑的设计区域的若干排咬合桩,相邻两个咬合桩相互咬合设置,咬合桩的底标高低于基坑的底标高;沿基坑的设计区域的周围设置的止水帷幕结构,止水帷幕结构的底标高低于基坑的底标高。本申请中通过挖除咬合桩上位于基坑范围内的部分以形成基坑,使咬合桩剩余的部分形成封底止水结构,有效地阻隔地下水从基坑的底部渗入基坑内。
Totally-enclosed foundation pit water stop system and construction method thereof
The invention relates to a totally-enclosed foundation pit water stopping system and a construction method thereof.The totally-enclosed foundation pit water stopping system comprises a plurality of rows of secant piles which are arranged in a design area of a foundation pit and cover the design area of the foundation pit, every two adjacent secant piles are arranged in an engaged mode, and the bottom elevation of the secant piles is lower than that of the foundation pit; the waterproof curtain structure is arranged around the design area of the foundation pit, and the bottom elevation of the waterproof curtain structure is lower than that of the foundation pit. According to the method, the foundation pit is formed by digging out the part, located in the foundation pit range, of the secant pile, the remaining part of the secant pile forms a bottom sealing and water stopping structure, and underground water is effectively prevented from permeating into the foundation pit from the bottom of the foundation pit.
本发明涉及一种全封闭式基坑止水系统及其施工方法,包括:设于基坑的设计区域且覆盖基坑的设计区域的若干排咬合桩,相邻两个咬合桩相互咬合设置,咬合桩的底标高低于基坑的底标高;沿基坑的设计区域的周围设置的止水帷幕结构,止水帷幕结构的底标高低于基坑的底标高。本申请中通过挖除咬合桩上位于基坑范围内的部分以形成基坑,使咬合桩剩余的部分形成封底止水结构,有效地阻隔地下水从基坑的底部渗入基坑内。
Totally-enclosed foundation pit water stop system and construction method thereof
全封闭式基坑止水系统及其施工方法
ZHANG YU (Autor:in) / ZHU JIAYU (Autor:in) / YI LIANG (Autor:in) / WANG YONGMING (Autor:in) / WANG LEI (Autor:in) / LI KAI (Autor:in) / XING JINMING (Autor:in)
29.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Totally-enclosed sound barrier and mounting method thereof
Europäisches Patentamt | 2023
|Totally-enclosed sound barrier and mounting method thereof
Europäisches Patentamt | 2024
|Totally-enclosed formwork cast-in-place concrete stair and construction method thereof
Europäisches Patentamt | 2022
|Railway totally-enclosed sound barrier and mounting method thereof
Europäisches Patentamt | 2021
|