Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated concrete foundation and construction method thereof
The invention relates to a fabricated concrete foundation. Comprising an embedded part, a steel support column and a sleeve, the embedded part comprises a prefabricated reinforced concrete foundation and a plurality of L-shaped bolts, the L-shaped bolts are embedded in the prefabricated reinforced concrete foundation, and a first cast-in-place layer and a second cast-in-place layer are sequentially arranged between the sleeve and the steel support column in the direction away from the prefabricated reinforced concrete foundation; the first cast-in-place layer and the prefabricated reinforced concrete foundation are connected into a whole, and the second cast-in-place layer and the first cast-in-place layer are connected into a whole. By arranging the embedded part, the embedded part can be prefabricated in a factory, the pouring and maintenance conditions of the embedded part are not affected by weather, the quality of a finished product is higher, and the production efficiency can be improved; when the embedded part needs to be used, the embedded part can be transported to a site, and the steel support column and the L-shaped bolt are connected, so that the construction period can be greatly shortened; the sleeve is arranged and arranged at the connecting position between the steel support column and the L-shaped bolt in a sleeving mode, so that the connecting strength of the steel support column and the L-shaped bolt is improved.
本发明涉及一种装配式混凝土基础。包括预埋件、钢支架柱、套筒,预埋件包括预制钢筋混凝土基础、若干L型螺栓,若干L型螺栓预埋于预制钢筋混凝土基础,套筒与钢支架柱之间,沿远离预制钢筋混凝土基础的方向依次设有第一现浇层、第二现浇层,第一现浇层与预制钢筋混凝土基础连为一体,第二现浇层与第一现浇层连为一体。本申请通过设置预埋件,预埋件能够在工厂预制,且预埋件的浇注和养护条件不受天气影响,成品质量更高,能够提高生产效率;当需要使用时,可将预埋件运输至现场并将钢支架柱及L型螺栓进行连接,能够大大缩短了施工工期;通过设置套筒,且套筒套设于钢支架柱与L型螺栓之间的连接处,以增加钢支架柱与L型螺栓的连接强度。
Fabricated concrete foundation and construction method thereof
The invention relates to a fabricated concrete foundation. Comprising an embedded part, a steel support column and a sleeve, the embedded part comprises a prefabricated reinforced concrete foundation and a plurality of L-shaped bolts, the L-shaped bolts are embedded in the prefabricated reinforced concrete foundation, and a first cast-in-place layer and a second cast-in-place layer are sequentially arranged between the sleeve and the steel support column in the direction away from the prefabricated reinforced concrete foundation; the first cast-in-place layer and the prefabricated reinforced concrete foundation are connected into a whole, and the second cast-in-place layer and the first cast-in-place layer are connected into a whole. By arranging the embedded part, the embedded part can be prefabricated in a factory, the pouring and maintenance conditions of the embedded part are not affected by weather, the quality of a finished product is higher, and the production efficiency can be improved; when the embedded part needs to be used, the embedded part can be transported to a site, and the steel support column and the L-shaped bolt are connected, so that the construction period can be greatly shortened; the sleeve is arranged and arranged at the connecting position between the steel support column and the L-shaped bolt in a sleeving mode, so that the connecting strength of the steel support column and the L-shaped bolt is improved.
本发明涉及一种装配式混凝土基础。包括预埋件、钢支架柱、套筒,预埋件包括预制钢筋混凝土基础、若干L型螺栓,若干L型螺栓预埋于预制钢筋混凝土基础,套筒与钢支架柱之间,沿远离预制钢筋混凝土基础的方向依次设有第一现浇层、第二现浇层,第一现浇层与预制钢筋混凝土基础连为一体,第二现浇层与第一现浇层连为一体。本申请通过设置预埋件,预埋件能够在工厂预制,且预埋件的浇注和养护条件不受天气影响,成品质量更高,能够提高生产效率;当需要使用时,可将预埋件运输至现场并将钢支架柱及L型螺栓进行连接,能够大大缩短了施工工期;通过设置套筒,且套筒套设于钢支架柱与L型螺栓之间的连接处,以增加钢支架柱与L型螺栓的连接强度。
Fabricated concrete foundation and construction method thereof
装配式混凝土基础及其施工方法
LIANG RUIQING (Autor:in) / YE QIGE (Autor:in) / LIANG ZHENSHENG (Autor:in) / CHEN CHANGZHEN (Autor:in) / ZHANG BOTAO (Autor:in) / TANG XUEMEI (Autor:in) / GAO ZHILIAN (Autor:in) / HONG CHUANHAI (Autor:in) / ZHAO YIJUE (Autor:in)
29.03.2022
Patent
Elektronische Ressource
Chinesisch
Prestressed concrete fabricated foundation structure and construction method thereof
Europäisches Patentamt | 2023
|Fabricated foundation and construction method thereof
Europäisches Patentamt | 2023
|Fabricated reservoir foundation and construction method thereof
Europäisches Patentamt | 2021
|Fabricated prefabricated foundation and construction method thereof
Europäisches Patentamt | 2022
|Fabricated street lamp foundation and construction method thereof
Europäisches Patentamt | 2024
|