Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Masonry mortar joint controller
The invention discloses a masonry mortar joint controller, and particularly relates to the field of mortar joint control, the masonry mortar joint controller comprises a first control mechanism, one side of the first control mechanism is provided with a second control mechanism used for adjusting the telescopic length, and one side of the second control mechanism is provided with an auxiliary supporting mechanism used for keeping the supporting balance of the second control mechanism; the first control mechanism at least comprises two first bearing frames, a plurality of limiting type supporting frames are fixedly installed on the outer walls of the two first bearing frames, the first bearing frames and the limiting type supporting frames are arranged in a perpendicular state, and a plurality of second bearing frames are sequentially arranged in the limiting type supporting frames at equal intervals. In the process of moving the third bearing frame, air in the inner cavity of the hollow sleeve promotes the air bag sleeve to expand or contract through the first communicating pipe so as to fixedly cover the outer wall of the third bearing frame, and in combination with firm supporting of the second communicating pipe, the third bearing frame is prevented from deviating due to the too long length.
本发明公开了砌体灰缝控制器,具体涉及灰缝控制领域,包括第一控制机构,第一控制机构的一侧设有用于调节伸缩长度的第二控制机构,第二控制机构的一侧设有用于保持第二控制机构支撑平衡性的辅助支撑机构,第一控制机构至少包括两个第一承托架,且两个第一承托架的外壁均固定安装有多个限位型支撑框,第一承托架与限位型支撑框之间呈垂直状态设置,限位型支撑框的内部依次等距设置有多个第二承托架。本发明通过在移动第三承托架的过程中,使得中空套管内腔的气体经由第一连通管促使气囊套发生膨胀或收缩而固定包覆在第三承托架的外壁,结合第二连通管的牢固支撑,防止第三承托架长度过长而发生偏斜。
Masonry mortar joint controller
The invention discloses a masonry mortar joint controller, and particularly relates to the field of mortar joint control, the masonry mortar joint controller comprises a first control mechanism, one side of the first control mechanism is provided with a second control mechanism used for adjusting the telescopic length, and one side of the second control mechanism is provided with an auxiliary supporting mechanism used for keeping the supporting balance of the second control mechanism; the first control mechanism at least comprises two first bearing frames, a plurality of limiting type supporting frames are fixedly installed on the outer walls of the two first bearing frames, the first bearing frames and the limiting type supporting frames are arranged in a perpendicular state, and a plurality of second bearing frames are sequentially arranged in the limiting type supporting frames at equal intervals. In the process of moving the third bearing frame, air in the inner cavity of the hollow sleeve promotes the air bag sleeve to expand or contract through the first communicating pipe so as to fixedly cover the outer wall of the third bearing frame, and in combination with firm supporting of the second communicating pipe, the third bearing frame is prevented from deviating due to the too long length.
本发明公开了砌体灰缝控制器,具体涉及灰缝控制领域,包括第一控制机构,第一控制机构的一侧设有用于调节伸缩长度的第二控制机构,第二控制机构的一侧设有用于保持第二控制机构支撑平衡性的辅助支撑机构,第一控制机构至少包括两个第一承托架,且两个第一承托架的外壁均固定安装有多个限位型支撑框,第一承托架与限位型支撑框之间呈垂直状态设置,限位型支撑框的内部依次等距设置有多个第二承托架。本发明通过在移动第三承托架的过程中,使得中空套管内腔的气体经由第一连通管促使气囊套发生膨胀或收缩而固定包覆在第三承托架的外壁,结合第二连通管的牢固支撑,防止第三承托架长度过长而发生偏斜。
Masonry mortar joint controller
砌体灰缝控制器
MENG XIANGJIE (Autor:in) / SUN XIAOCHAO (Autor:in) / WANG HUAIYU (Autor:in) / WANG HONGBIN (Autor:in) / MENG HAO (Autor:in) / SHEN WENLIANG (Autor:in) / WANG KAI (Autor:in)
01.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Brick masonry mortar joint mortar replacement method and brick masonry structure
Europäisches Patentamt | 2023
|Wall masonry mortar flattening and mortar joint closing device
Europäisches Patentamt | 2022
|