Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large anchorage splay cable saddle deflection angle mounting and positioning device and construction method thereof
The invention discloses a large anchorage splay cable saddle deflection angle mounting and positioning device and a construction method thereof. The large anchorage splay cable saddle deflection angle mounting and positioning device comprises a first supporting frame arranged on a horizontal plane and a second supporting frame arranged on an inclined slope, and a base is arranged on the inclined slope; the bottom end of the first supporting frame is fixedly connected with an upper embedded part embedded in the horizontal plane, threaded steel facing the inclined slope is arranged at the top end of the first supporting frame in a penetrating mode, the end, facing the cable saddle, of the threaded steel is fixedly connected with a lifting lug on the cable saddle, and an anchor beam is fixedly arranged at the end, where the threaded steel penetrates out, of the first supporting frame. Nuts connected with the deformed steel bars are arranged on the anchor beams; the bottom end of the second supporting frame is fixedly connected with a lower embedded part embedded in the inclined slope face, and a supporting pad abutting against the splay cable saddle is fixedly arranged at the top end of the second supporting frame. The invention aims to provide the positioning device which is simple and convenient to combine, high in mounting efficiency and capable of accurately positioning the deflection angle of the splay cable saddle and the construction method.
本发明公开了一种大型锚碇散索鞍偏角安装定位装置及其施工方法,包括在水平面上设置的第一支撑架以及在倾斜坡面上设置的第二支撑架,倾斜坡面上设置有底座;所述第一支撑架的底端固定连接有埋设在水平面内的上预埋件,第一支撑架的顶端穿设有朝向倾斜坡面的螺纹钢,螺纹钢朝向散索鞍的一端与散索鞍上的吊耳固定连接,第一支撑架在螺纹钢穿出的一端固定设置有锚梁,锚梁上设置有与螺纹钢连接的螺帽;所述第二支撑架的底端固定连接有埋设在倾斜坡面内的下预埋件,第二支撑架的顶端固定设置有与散索鞍相抵的支撑垫。本发明旨在提供一种组合简便,安装效率高,能精确定位散索鞍偏角的定位装置和施工方法。
Large anchorage splay cable saddle deflection angle mounting and positioning device and construction method thereof
The invention discloses a large anchorage splay cable saddle deflection angle mounting and positioning device and a construction method thereof. The large anchorage splay cable saddle deflection angle mounting and positioning device comprises a first supporting frame arranged on a horizontal plane and a second supporting frame arranged on an inclined slope, and a base is arranged on the inclined slope; the bottom end of the first supporting frame is fixedly connected with an upper embedded part embedded in the horizontal plane, threaded steel facing the inclined slope is arranged at the top end of the first supporting frame in a penetrating mode, the end, facing the cable saddle, of the threaded steel is fixedly connected with a lifting lug on the cable saddle, and an anchor beam is fixedly arranged at the end, where the threaded steel penetrates out, of the first supporting frame. Nuts connected with the deformed steel bars are arranged on the anchor beams; the bottom end of the second supporting frame is fixedly connected with a lower embedded part embedded in the inclined slope face, and a supporting pad abutting against the splay cable saddle is fixedly arranged at the top end of the second supporting frame. The invention aims to provide the positioning device which is simple and convenient to combine, high in mounting efficiency and capable of accurately positioning the deflection angle of the splay cable saddle and the construction method.
本发明公开了一种大型锚碇散索鞍偏角安装定位装置及其施工方法,包括在水平面上设置的第一支撑架以及在倾斜坡面上设置的第二支撑架,倾斜坡面上设置有底座;所述第一支撑架的底端固定连接有埋设在水平面内的上预埋件,第一支撑架的顶端穿设有朝向倾斜坡面的螺纹钢,螺纹钢朝向散索鞍的一端与散索鞍上的吊耳固定连接,第一支撑架在螺纹钢穿出的一端固定设置有锚梁,锚梁上设置有与螺纹钢连接的螺帽;所述第二支撑架的底端固定连接有埋设在倾斜坡面内的下预埋件,第二支撑架的顶端固定设置有与散索鞍相抵的支撑垫。本发明旨在提供一种组合简便,安装效率高,能精确定位散索鞍偏角的定位装置和施工方法。
Large anchorage splay cable saddle deflection angle mounting and positioning device and construction method thereof
一种大型锚碇散索鞍偏角安装定位装置及其施工方法
PENG HAO (Autor:in) / GU PEISHENG (Autor:in) / CHEN SHIXIANG (Autor:in) / ZENG YUAN (Autor:in) / LIU KANG (Autor:in) / ZHU JUN (Autor:in) / YANG YIHUI (Autor:in) / XIONG GANG (Autor:in) / ZHANG TAO (Autor:in) / WANG XINCHUAN (Autor:in)
05.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Main cable splay saddle for self-anchorage suspension bridge
Europäisches Patentamt | 2015
|Roller assembly of splay cable saddle and splay cable saddle
Europäisches Patentamt | 2023
|Installation and construction method for deeply-buried tunnel type anchorage splay saddle
Europäisches Patentamt | 2021
|Swing installation construction method for tunnel anchorage splay saddle at a restricted site
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|