Construction method for drilling and pile forming of hydraulic down-the-hole hammer
The invention discloses a construction method for drilling and pile forming of a hydraulic down-the-hole hammer, and belongs to the technical field of pile foundation construction in geotechnical engineering. Based on a slurry retaining wall drilling machine, a hydraulic down-the-hole hammer and a matched pipeline system and slurry circulating system, the construction method for efficiently carrying out deep drilling operation and forming the cast-in-situ bored pile comprises the following steps that slurry retaining wall hole forming is carried out; arranging a hydraulic down-the-hole hammer pipeline; installing a hydraulic down-the-hole hammer drilling machine; performing hydraulic down-the-hole hammer construction operation; and the cast-in-situ bored pile construction is completed. Holes are formed in the soft soil layer on the upper portion of the stratum through the slurry wall protecting method, when drilling is conducted to the strongly-weathered rock stratum or the moderately-weathered rock stratum, construction is conducted through the hydraulic down-the-hole hammer method, the hydraulic down-the-hole hammer is combined with the slurry wall protecting method, and therefore construction efficiency and quality are guaranteed.
本发明公开了一种液压潜孔锤钻进成桩的施工方法,属于岩土工程中桩基施工技术领域。基于泥浆护壁钻机、液压潜孔锤及其配套的管路系统和浆液循环系统,采用如下步骤高效开展深层钻孔作业,形成钻孔灌注桩的施工方法:泥浆护壁成孔;液压潜孔锤管路布置;液压潜孔锤钻机安装;液压潜孔锤施工作业;钻孔灌注桩施工完成。本发明在地层的上部较软的土层中采用泥浆护壁方法成孔,钻进至强风化岩层或者中风化岩层时,采用液压潜孔锤法进行施工,将液压潜孔锤与泥浆护壁工法相结合,从而保证施工效率和质量。
Construction method for drilling and pile forming of hydraulic down-the-hole hammer
The invention discloses a construction method for drilling and pile forming of a hydraulic down-the-hole hammer, and belongs to the technical field of pile foundation construction in geotechnical engineering. Based on a slurry retaining wall drilling machine, a hydraulic down-the-hole hammer and a matched pipeline system and slurry circulating system, the construction method for efficiently carrying out deep drilling operation and forming the cast-in-situ bored pile comprises the following steps that slurry retaining wall hole forming is carried out; arranging a hydraulic down-the-hole hammer pipeline; installing a hydraulic down-the-hole hammer drilling machine; performing hydraulic down-the-hole hammer construction operation; and the cast-in-situ bored pile construction is completed. Holes are formed in the soft soil layer on the upper portion of the stratum through the slurry wall protecting method, when drilling is conducted to the strongly-weathered rock stratum or the moderately-weathered rock stratum, construction is conducted through the hydraulic down-the-hole hammer method, the hydraulic down-the-hole hammer is combined with the slurry wall protecting method, and therefore construction efficiency and quality are guaranteed.
本发明公开了一种液压潜孔锤钻进成桩的施工方法,属于岩土工程中桩基施工技术领域。基于泥浆护壁钻机、液压潜孔锤及其配套的管路系统和浆液循环系统,采用如下步骤高效开展深层钻孔作业,形成钻孔灌注桩的施工方法:泥浆护壁成孔;液压潜孔锤管路布置;液压潜孔锤钻机安装;液压潜孔锤施工作业;钻孔灌注桩施工完成。本发明在地层的上部较软的土层中采用泥浆护壁方法成孔,钻进至强风化岩层或者中风化岩层时,采用液压潜孔锤法进行施工,将液压潜孔锤与泥浆护壁工法相结合,从而保证施工效率和质量。
Construction method for drilling and pile forming of hydraulic down-the-hole hammer
一种液压潜孔锤钻进成桩的施工方法
LI JIANPING (Autor:in) / SONG WEIJIE (Autor:in) / ZHU QINGKAI (Autor:in) / MA XUEBO (Autor:in) / LIU GUANGLEI (Autor:in) / WU SIYU (Autor:in)
08.04.2022
Patent