Oval beam plane construction paying-off method
The invention relates to the technical field of engineering construction, in particular to an oval beam plane construction paying-off method. Comprising the steps of drawing deepening, surveying and setting-out, monitoring acceptance, technical disclosure, structure construction and the like. According to the design, the CAD technology is adopted for deepening the drawing, the deepened drawing is arranged in the coordinate general drawing in a sleeving mode, then surveying and setting-out operation and final structure construction are conducted at the designated position according to the deepened drawing, the setting-out construction efficiency is improved, the operation precision is improved, and the setting-out error is reduced; the overall method is scientific and reasonable, convenient to operate, accurate in positioning and checking and capable of being widely applied to various constructional engineering needing to build the oval hollow beam, the paying-off construction efficiency of oval beam plane construction can be improved, adjacent floor planes outside the hollow portion of the oval beam are collinear, and therefore the construction quality of the oval beam is improved.
本发明涉及工程建设技术领域,具体地说,涉及一种椭圆形梁平面施工放线方法。包括图纸深化、测量放线、报监验收、技术交底、结构施工等步骤。本发明设计采用CAD技术对图纸进行深化,将深化后的图纸套入坐标总图,再按照深化后的图纸在指定位置进行测量放线操作及最终的结构施工,提高放线施工效率,提高作业精度,降低放样误差;整体方法科学合理,操作方便,定位校核准确,可以广泛应用于多种需要建设椭圆形中空梁的建筑工程中,可以提高椭圆形梁平面施工放线施工效率,使椭圆梁中空部位的外边相邻楼层平面共线,从而提高椭圆形梁的施工质量。
Oval beam plane construction paying-off method
The invention relates to the technical field of engineering construction, in particular to an oval beam plane construction paying-off method. Comprising the steps of drawing deepening, surveying and setting-out, monitoring acceptance, technical disclosure, structure construction and the like. According to the design, the CAD technology is adopted for deepening the drawing, the deepened drawing is arranged in the coordinate general drawing in a sleeving mode, then surveying and setting-out operation and final structure construction are conducted at the designated position according to the deepened drawing, the setting-out construction efficiency is improved, the operation precision is improved, and the setting-out error is reduced; the overall method is scientific and reasonable, convenient to operate, accurate in positioning and checking and capable of being widely applied to various constructional engineering needing to build the oval hollow beam, the paying-off construction efficiency of oval beam plane construction can be improved, adjacent floor planes outside the hollow portion of the oval beam are collinear, and therefore the construction quality of the oval beam is improved.
本发明涉及工程建设技术领域,具体地说,涉及一种椭圆形梁平面施工放线方法。包括图纸深化、测量放线、报监验收、技术交底、结构施工等步骤。本发明设计采用CAD技术对图纸进行深化,将深化后的图纸套入坐标总图,再按照深化后的图纸在指定位置进行测量放线操作及最终的结构施工,提高放线施工效率,提高作业精度,降低放样误差;整体方法科学合理,操作方便,定位校核准确,可以广泛应用于多种需要建设椭圆形中空梁的建筑工程中,可以提高椭圆形梁平面施工放线施工效率,使椭圆梁中空部位的外边相邻楼层平面共线,从而提高椭圆形梁的施工质量。
Oval beam plane construction paying-off method
一种椭圆形梁平面施工放线方法
DONG LIANGCHEN (Autor:in) / WANG ZHIZHONG (Autor:in) / JIA YOUHENG (Autor:in) / DU QI (Autor:in) / REN XIAOFEI (Autor:in) / QIU YIDE (Autor:in) / LIN XIANGJUN (Autor:in) / LI YAPING (Autor:in)
08.04.2022
Patent
Elektronische Ressource
Chinesisch