Box girder forming system based on bracket modified hanging basket structure
The invention relates to a box girder forming system based on a bracket modified hanging basket structure. The forming system is arranged on a box girder buttress and a box girder. The hanging basket is characterized by comprising an upper hanging basket module and a lower hanging basket module, and the upper hanging basket module and the lower hanging basket module are connected through a hanger; a bracket structure which is detached firstly is installed at the top end of a box girder, the bracket structure, a bottom rod and a diagonal draw bar form a supporting structure for installing a front upper cross beam, and a front hanger is arranged on the front upper cross beam to be connected with a lower hanging basket module; the function that the bracket is disassembled first and then disassembled is fully utilized, the bracket is directly used for assembling the upper hanging basket module, a supporting structure profile for supporting the front hanger is saved, and structural redundancy is also avoided; and the utilization rate of the profile is improved.
本发明涉及一种基于托架改造挂篮结构的箱梁成型系统,该成型系统设置在箱梁支墩及箱梁上;其特征在于:包括上挂篮模块和下挂篮模块,且上挂篮模块与下挂篮模块之间通过吊挂相连;通过将先进行拆卸的托架结构安装到箱梁顶端与底杆和斜拉杆形成安装前上横梁的支撑结构,并在前上横梁上设置前吊挂与下挂篮模块相连;充分利用了托架在先拆卸后的作用,直接用于上挂篮模块的组装,节省了支撑前吊挂的支撑结构型材,也避免了结构的冗余;提升了型材的利用率。
Box girder forming system based on bracket modified hanging basket structure
The invention relates to a box girder forming system based on a bracket modified hanging basket structure. The forming system is arranged on a box girder buttress and a box girder. The hanging basket is characterized by comprising an upper hanging basket module and a lower hanging basket module, and the upper hanging basket module and the lower hanging basket module are connected through a hanger; a bracket structure which is detached firstly is installed at the top end of a box girder, the bracket structure, a bottom rod and a diagonal draw bar form a supporting structure for installing a front upper cross beam, and a front hanger is arranged on the front upper cross beam to be connected with a lower hanging basket module; the function that the bracket is disassembled first and then disassembled is fully utilized, the bracket is directly used for assembling the upper hanging basket module, a supporting structure profile for supporting the front hanger is saved, and structural redundancy is also avoided; and the utilization rate of the profile is improved.
本发明涉及一种基于托架改造挂篮结构的箱梁成型系统,该成型系统设置在箱梁支墩及箱梁上;其特征在于:包括上挂篮模块和下挂篮模块,且上挂篮模块与下挂篮模块之间通过吊挂相连;通过将先进行拆卸的托架结构安装到箱梁顶端与底杆和斜拉杆形成安装前上横梁的支撑结构,并在前上横梁上设置前吊挂与下挂篮模块相连;充分利用了托架在先拆卸后的作用,直接用于上挂篮模块的组装,节省了支撑前吊挂的支撑结构型材,也避免了结构的冗余;提升了型材的利用率。
Box girder forming system based on bracket modified hanging basket structure
一种基于托架改造挂篮结构的箱梁成型系统
LIU LIANGLIANG (Autor:in) / FU LUNPENG (Autor:in) / GE YONGFEI (Autor:in) / WANG ZHONGHUA (Autor:in) / MAO YAYING (Autor:in)
15.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge hanging basket cast-in-place box girder bracket and using method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Position-adjustable hanging basket suspension bracket for pitched roof
Europäisches Patentamt | 2024
|Construction hanging basket structure and hanging basket moving method
Europäisches Patentamt | 2024
|