Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting method for casting house roof structure
The invention relates to an installation method for a casting house roof structure. The installation method comprises the following steps that firstly, a casting house traveling crane is installed; 2, a movable platform is built on the traveling trolley; 3, the casting house crane is driven to the position below the casting house roof structure needing to be installed, the crane trolley is started, and the movable platform is moved to the initial installation position of the casting house roof truss structure; 4, an upper chord structure of the casting house roof structure is installed; 5, starting a casting house crane, and moving the movable platform to a next span to install an upper chord structure of the casting house roof structure; 6, after the upper chord structures of the same row of roofs are installed, the traveling trolley is moved to the upper chord structures of the next row of roofs to be installed; and 7, after the upper chord structure of the roof is installed, the lower chord structures of the roof are reversely and sequentially installed from the end position. By the adoption of the installation method, a stable, reliable and safe movable platform is created for installation of the roof structure, and the safety of high-altitude operation personnel is improved.
本发明涉及一种出铁场屋面结构安装方法,包括以下步骤:步骤1:安装出铁场行车;步骤2:在行车小车上搭建活动平台;步骤3:将出铁场行车开至需要安装的出铁场屋面结构下方,开动行车小车,移动活动平台至出铁场屋架结构安装初始位置;步骤4:安装出铁场屋面结构上弦结构;步骤5:启动出铁场行车,移动活动平台至下一跨安装出铁场屋面结构的上弦结构;步骤6:同一列屋面的上弦结构安装完毕后,将行车小车移动至下一列安装屋面的上弦结构;步骤7:屋面的上弦结构安装完成后,从结束位置反向顺序安装屋面下弦结构。本发明采用本安装方法为屋面结构安装创造了一个稳定、可靠、安全的可移动平台,提高了高空作业人员的安全性。
Mounting method for casting house roof structure
The invention relates to an installation method for a casting house roof structure. The installation method comprises the following steps that firstly, a casting house traveling crane is installed; 2, a movable platform is built on the traveling trolley; 3, the casting house crane is driven to the position below the casting house roof structure needing to be installed, the crane trolley is started, and the movable platform is moved to the initial installation position of the casting house roof truss structure; 4, an upper chord structure of the casting house roof structure is installed; 5, starting a casting house crane, and moving the movable platform to a next span to install an upper chord structure of the casting house roof structure; 6, after the upper chord structures of the same row of roofs are installed, the traveling trolley is moved to the upper chord structures of the next row of roofs to be installed; and 7, after the upper chord structure of the roof is installed, the lower chord structures of the roof are reversely and sequentially installed from the end position. By the adoption of the installation method, a stable, reliable and safe movable platform is created for installation of the roof structure, and the safety of high-altitude operation personnel is improved.
本发明涉及一种出铁场屋面结构安装方法,包括以下步骤:步骤1:安装出铁场行车;步骤2:在行车小车上搭建活动平台;步骤3:将出铁场行车开至需要安装的出铁场屋面结构下方,开动行车小车,移动活动平台至出铁场屋架结构安装初始位置;步骤4:安装出铁场屋面结构上弦结构;步骤5:启动出铁场行车,移动活动平台至下一跨安装出铁场屋面结构的上弦结构;步骤6:同一列屋面的上弦结构安装完毕后,将行车小车移动至下一列安装屋面的上弦结构;步骤7:屋面的上弦结构安装完成后,从结束位置反向顺序安装屋面下弦结构。本发明采用本安装方法为屋面结构安装创造了一个稳定、可靠、安全的可移动平台,提高了高空作业人员的安全性。
Mounting method for casting house roof structure
一种出铁场屋面结构安装方法
LIU ZHONG (Autor:in) / LYU HONG (Autor:in) / YANG DAIMAO (Autor:in) / FAN JIAHUI (Autor:in) / LI ZONGDA (Autor:in) / YANG YUCHAO (Autor:in)