Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for settlement post-cast strip supported by reinforced concrete column
The invention belongs to the technical field of building construction, particularly belongs to a settlement post-cast strip structure supporting technology, and particularly relates to a construction method for a settlement post-cast strip supported by a reinforced concrete column. The method mainly comprises the following steps that reinforced concrete columns are arranged below beams on the two sides of the post-cast strip to replace traditional supporting frames; and before closed pouring construction is conducted on the post-cast strip, the post-cast strip supporting frame is erected again and used for protective dismantling of subsequent reinforced concrete columns. According to the technical scheme, a supporting frame supporting system is replaced with the reinforced concrete columns, the turnover period of the settlement post-cast strip supporting system is greatly shortened, the lease cost is reduced, and the service life of materials of the supporting system is greatly prolonged; through modeling theoretical calculation of a building structure body, the positions of the reinforced concrete columns are accurately arranged, the sizes and materials are accurately selected, and waste of the materials is avoided; and all the reinforced concrete columns after protective dismantling can be recycled, so that the construction slag treatment cost is not further increased, and energy conservation and environmental protection are realized.
本发明属于建筑施工技术领域,具体属于沉降后浇带结构支撑技术,特别涉及一种钢筋砼柱支撑沉降后浇带施工方法。主要包括如下步骤:在后浇带两侧的梁下设置钢筋砼柱,替代传统的支撑架;对后浇带进行封闭浇筑施工前,重新搭设后浇带支撑架,并用于后续钢筋砼柱的保护性拆除。本发明的技术方案通过钢筋砼柱代替支撑架支撑体系,极大的缩短了沉降后浇带支撑系统的周转周期,缩减了租赁成本,支撑体系材料使用寿命极大的延长;通过对建筑结构体的建模理论计算,精确的布置钢筋砼柱的位置和选择尺寸、材料,避免材料的浪费;保护性拆除后的所有钢筋砼柱均可回收利用,不会进一步增加处理建渣成本,节能环保。
Construction method for settlement post-cast strip supported by reinforced concrete column
The invention belongs to the technical field of building construction, particularly belongs to a settlement post-cast strip structure supporting technology, and particularly relates to a construction method for a settlement post-cast strip supported by a reinforced concrete column. The method mainly comprises the following steps that reinforced concrete columns are arranged below beams on the two sides of the post-cast strip to replace traditional supporting frames; and before closed pouring construction is conducted on the post-cast strip, the post-cast strip supporting frame is erected again and used for protective dismantling of subsequent reinforced concrete columns. According to the technical scheme, a supporting frame supporting system is replaced with the reinforced concrete columns, the turnover period of the settlement post-cast strip supporting system is greatly shortened, the lease cost is reduced, and the service life of materials of the supporting system is greatly prolonged; through modeling theoretical calculation of a building structure body, the positions of the reinforced concrete columns are accurately arranged, the sizes and materials are accurately selected, and waste of the materials is avoided; and all the reinforced concrete columns after protective dismantling can be recycled, so that the construction slag treatment cost is not further increased, and energy conservation and environmental protection are realized.
本发明属于建筑施工技术领域,具体属于沉降后浇带结构支撑技术,特别涉及一种钢筋砼柱支撑沉降后浇带施工方法。主要包括如下步骤:在后浇带两侧的梁下设置钢筋砼柱,替代传统的支撑架;对后浇带进行封闭浇筑施工前,重新搭设后浇带支撑架,并用于后续钢筋砼柱的保护性拆除。本发明的技术方案通过钢筋砼柱代替支撑架支撑体系,极大的缩短了沉降后浇带支撑系统的周转周期,缩减了租赁成本,支撑体系材料使用寿命极大的延长;通过对建筑结构体的建模理论计算,精确的布置钢筋砼柱的位置和选择尺寸、材料,避免材料的浪费;保护性拆除后的所有钢筋砼柱均可回收利用,不会进一步增加处理建渣成本,节能环保。
Construction method for settlement post-cast strip supported by reinforced concrete column
一种钢筋砼柱支撑沉降后浇带施工方法
LI XIONGFEI (Autor:in) / LI WENBO (Autor:in) / ZHANG LIN (Autor:in) / JIA PENGKUN (Autor:in) / FENG YU (Autor:in) / LI ZHUN (Autor:in) / YANG YUANJUN (Autor:in) / ZHANG BIN (Autor:in) / CHEN CUI (Autor:in) / YANG LIZHEN (Autor:in)
29.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Self-compacting concrete pouring construction method for settlement post-cast strip
Europäisches Patentamt | 2024
|Pouring structure of settlement post-cast strip and construction method of post-cast strip
Europäisches Patentamt | 2023
|Basement roof settlement post-cast strip construction method
Europäisches Patentamt | 2021
|Construction and manufacturing method of settlement post-cast strip
Europäisches Patentamt | 2024