Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ground beam reinforcing structure in building deviation rectifying process
The invention discloses a ground beam reinforcing structure in the building deviation rectifying process, and relates to the field of building deviation rectifying. The device comprises a ground beam, a fender pile is installed on one side of the ground beam, a drainage pipe is installed in the ground beam in a penetrating mode, a partition plate is arranged at the bottom of the ground beam, a base plate is arranged at the bottom of the partition plate, a sliding layer is arranged at the bottom of the base plate, a supporting beam is arranged at the bottom of the sliding layer, and a static pressure pile is arranged at the bottom of the supporting beam. The water stop plate is mounted at the bottom of the second pile body, the drainage pipe is mounted on the partition plate, rainwater continues to infiltrate after a ground beam is wetted by heavy rain rainwater, the rainwater can be accumulated on the partition plate and drained through the drainage pipe due to the fact that the partition plate is provided with the waterproof material, and the water stop plate is used for avoiding soil sedimentation caused by infiltration of rainwater around a building. And the stability of the foundation is improved, so that the ground beam is stabilized.
本发明公开了一种建筑物纠偏过程中地梁加固结构,涉及建筑物纠偏领域。本发明包括地梁,所述地梁的一侧安装有护桩,所述地梁内贯穿安装有排水管,所述地梁的底部设置有分隔板,所述分隔板的底部设置有垫板,所述垫板的底部设置有滑移层,所述滑移层的底部设置有托梁,所述托梁的底部设置有静压桩,本发明通过在第二桩体底部安装隔水板,并在分隔板上安装排水管,当大雨雨水浸湿地梁后,雨水继续下渗,由于分隔板上设置防水材料,雨水会堆积在分隔板上,并通过排水管排出,隔水板的作用则是避免建筑周边雨水下渗造成土壤沉降,提高地基的稳定性,从而对地梁进行稳固。
Ground beam reinforcing structure in building deviation rectifying process
The invention discloses a ground beam reinforcing structure in the building deviation rectifying process, and relates to the field of building deviation rectifying. The device comprises a ground beam, a fender pile is installed on one side of the ground beam, a drainage pipe is installed in the ground beam in a penetrating mode, a partition plate is arranged at the bottom of the ground beam, a base plate is arranged at the bottom of the partition plate, a sliding layer is arranged at the bottom of the base plate, a supporting beam is arranged at the bottom of the sliding layer, and a static pressure pile is arranged at the bottom of the supporting beam. The water stop plate is mounted at the bottom of the second pile body, the drainage pipe is mounted on the partition plate, rainwater continues to infiltrate after a ground beam is wetted by heavy rain rainwater, the rainwater can be accumulated on the partition plate and drained through the drainage pipe due to the fact that the partition plate is provided with the waterproof material, and the water stop plate is used for avoiding soil sedimentation caused by infiltration of rainwater around a building. And the stability of the foundation is improved, so that the ground beam is stabilized.
本发明公开了一种建筑物纠偏过程中地梁加固结构,涉及建筑物纠偏领域。本发明包括地梁,所述地梁的一侧安装有护桩,所述地梁内贯穿安装有排水管,所述地梁的底部设置有分隔板,所述分隔板的底部设置有垫板,所述垫板的底部设置有滑移层,所述滑移层的底部设置有托梁,所述托梁的底部设置有静压桩,本发明通过在第二桩体底部安装隔水板,并在分隔板上安装排水管,当大雨雨水浸湿地梁后,雨水继续下渗,由于分隔板上设置防水材料,雨水会堆积在分隔板上,并通过排水管排出,隔水板的作用则是避免建筑周边雨水下渗造成土壤沉降,提高地基的稳定性,从而对地梁进行稳固。
Ground beam reinforcing structure in building deviation rectifying process
一种建筑物纠偏过程中地梁加固结构
ZHOU LI (Autor:in) / CHEN HONGYONG (Autor:in)
03.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Deviation rectifying and reinforcing process for existing building
Europäisches Patentamt | 2023
|Deviation rectifying and reinforcing structure for shallow foundation building
Europäisches Patentamt | 2024
|Building deviation rectifying structure and deviation rectifying method
Europäisches Patentamt | 2021
|Deviation rectifying and reinforcing mechanism for base building
Europäisches Patentamt | 2020
|