Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a production method of a tubular pile, which comprises the following steps: a mud preparation part, including a batching step and a mixing step, in the batching step, raw materials comprise cement, gravel, water and additives, the additives comprise 0.5%-0.7% of a glue reducing agent and 1.5%-3.5% of a water reducing agent, and in the mixing step, the raw materials are stirred and mixed to prepare concrete mud; the cage manufacturing part comprises a cage body machining step, an end plate machining step and a steel hoop assembling step; the pile manufacturing part comprises a loading step, a centrifuging step and a steam curing step which are arranged in sequence, the loading step comprises a caging step, a material distributing step, a mold locking step and a tensioning step, the centrifuging step drives a tubular pile mold to rotate, and the steam curing step comprises a normal-pressure steam curing step, a mold removing step and a high-pressure steam curing step which are arranged in sequence. According to the production method of the tubular pile, energy consumption can be reduced, and water and cement can be saved.
本发明公开了一种管桩的生产方法,包括:制泥部分,包括配料步骤和拌料步骤,在配料步骤中,原料包括水泥、砂石、水和外加剂,外加剂包括0.5%~0.7%的减胶剂、1.5~3.5%的减水剂,在拌料步骤中,将原料搅拌混合,制出混凝土泥;制笼部分,包括加工笼身步骤、加工端板步骤和装配钢套箍步骤;制桩部分,包括依次设置的装料步骤、离心步骤和蒸养步骤,装料步骤包括装笼工步、布料工步、锁模工步、张拉工步,离心步骤带动管桩模具自转,蒸养步骤包括依次设置的常压蒸养工步、拆模工步和高压蒸养工步。本发明的一种管桩的生产方法,能够降低能耗,节省水和水泥。
The invention discloses a production method of a tubular pile, which comprises the following steps: a mud preparation part, including a batching step and a mixing step, in the batching step, raw materials comprise cement, gravel, water and additives, the additives comprise 0.5%-0.7% of a glue reducing agent and 1.5%-3.5% of a water reducing agent, and in the mixing step, the raw materials are stirred and mixed to prepare concrete mud; the cage manufacturing part comprises a cage body machining step, an end plate machining step and a steel hoop assembling step; the pile manufacturing part comprises a loading step, a centrifuging step and a steam curing step which are arranged in sequence, the loading step comprises a caging step, a material distributing step, a mold locking step and a tensioning step, the centrifuging step drives a tubular pile mold to rotate, and the steam curing step comprises a normal-pressure steam curing step, a mold removing step and a high-pressure steam curing step which are arranged in sequence. According to the production method of the tubular pile, energy consumption can be reduced, and water and cement can be saved.
本发明公开了一种管桩的生产方法,包括:制泥部分,包括配料步骤和拌料步骤,在配料步骤中,原料包括水泥、砂石、水和外加剂,外加剂包括0.5%~0.7%的减胶剂、1.5~3.5%的减水剂,在拌料步骤中,将原料搅拌混合,制出混凝土泥;制笼部分,包括加工笼身步骤、加工端板步骤和装配钢套箍步骤;制桩部分,包括依次设置的装料步骤、离心步骤和蒸养步骤,装料步骤包括装笼工步、布料工步、锁模工步、张拉工步,离心步骤带动管桩模具自转,蒸养步骤包括依次设置的常压蒸养工步、拆模工步和高压蒸养工步。本发明的一种管桩的生产方法,能够降低能耗,节省水和水泥。
Production method of tubular pile
一种管桩的生产方法
LI ZIYUAN (Autor:in)
06.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E02D
FOUNDATIONS
,
Gründungen
Tubular pile connecting device and tubular pile manufacturing method
Europäisches Patentamt | 2020
|TUBULAR PILE INSTALLATION METHOD AND TUBULAR PILE HOLDING DEVICE
Europäisches Patentamt | 2019
|