Reservoir for water conservancy project and construction method thereof
The invention relates to the field of reservoir construction, in particular to a reservoir for hydraulic engineering and a construction method thereof.The reservoir is arranged in a foundation pit excavated on the earth surface, the reservoir sequentially comprises a bottom plate, a reservoir wall and a top cover from bottom to top, the bottom plate, the reservoir wall and the top cover are all prefabricated parts, the bottom plate is arranged on the bottom wall of the foundation pit, the reservoir wall is fixed to the bottom plate, and the top cover is fixed to the bottom plate; the pool wall is of an assembly type structure composed of a plurality of splice plates, the top cover covers the top of the pool wall, inner container rings which are sequentially stacked in the vertical direction are arranged on the inner side of the pool wall, and the inner container rings are fixedly arranged in the mode of being attached to the inner side of the pool wall. In the application, during construction, the bottom plate, the pool wall and the top cover are assembled into the reservoir at one time, cast-in-place is not needed any more, the time for waiting for pouring and solidification is saved, and the effect of shortening the construction period of the reservoir is achieved.
本申请涉及蓄水池施工的领域,尤其是涉及一种水利工程用蓄水池及其施工方法,其蓄水池设于地表开挖的基坑内,所述蓄水池从下到上依次包括底板、池壁和顶盖,底板、池壁和顶盖均为预制件,底板设于基坑底壁处,池壁固定在底板上,池壁采用多个拼接板组成的装配式结构,顶盖覆盖池壁顶部,池壁内侧设置有沿竖直方向依次堆叠的内胆环,内胆环贴合池壁内侧固定设置。本申请中,施工时一次性将底板、池壁和顶盖装配成蓄水池,不再需要进行现场浇筑,节省了等待浇筑凝固的时间,达到了缩短蓄水池施工周期的效果。
Reservoir for water conservancy project and construction method thereof
The invention relates to the field of reservoir construction, in particular to a reservoir for hydraulic engineering and a construction method thereof.The reservoir is arranged in a foundation pit excavated on the earth surface, the reservoir sequentially comprises a bottom plate, a reservoir wall and a top cover from bottom to top, the bottom plate, the reservoir wall and the top cover are all prefabricated parts, the bottom plate is arranged on the bottom wall of the foundation pit, the reservoir wall is fixed to the bottom plate, and the top cover is fixed to the bottom plate; the pool wall is of an assembly type structure composed of a plurality of splice plates, the top cover covers the top of the pool wall, inner container rings which are sequentially stacked in the vertical direction are arranged on the inner side of the pool wall, and the inner container rings are fixedly arranged in the mode of being attached to the inner side of the pool wall. In the application, during construction, the bottom plate, the pool wall and the top cover are assembled into the reservoir at one time, cast-in-place is not needed any more, the time for waiting for pouring and solidification is saved, and the effect of shortening the construction period of the reservoir is achieved.
本申请涉及蓄水池施工的领域,尤其是涉及一种水利工程用蓄水池及其施工方法,其蓄水池设于地表开挖的基坑内,所述蓄水池从下到上依次包括底板、池壁和顶盖,底板、池壁和顶盖均为预制件,底板设于基坑底壁处,池壁固定在底板上,池壁采用多个拼接板组成的装配式结构,顶盖覆盖池壁顶部,池壁内侧设置有沿竖直方向依次堆叠的内胆环,内胆环贴合池壁内侧固定设置。本申请中,施工时一次性将底板、池壁和顶盖装配成蓄水池,不再需要进行现场浇筑,节省了等待浇筑凝固的时间,达到了缩短蓄水池施工周期的效果。
Reservoir for water conservancy project and construction method thereof
一种水利工程用蓄水池及其施工方法
SHI HONGSHENG (Autor:in) / SONG LICHEN (Autor:in) / LIU CONG (Autor:in)
06.05.2022
Patent
Elektronische Ressource
Chinesisch
Water conservancy project environment-friendly reservoir
Europäisches Patentamt | 2021
|Anti-blocking reservoir for water conservancy project
Europäisches Patentamt | 2022
|Anti-blocking reservoir for water conservancy project
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|