Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building anti-seepage construction process
The building anti-seepage construction technology comprises the following steps that S1, drainage mechanisms are installed, specifically, a plurality of drainage mechanisms are installed on the two sides of the top of a building body, and each drainage mechanism comprises a first drainage pipe, a connecting cylinder and a second drainage pipe; s2, a first waterproof base layer is poured, specifically, the first waterproof base layer is poured on the top of the building body, a plurality of drainage grooves are formed in the first waterproof base layer, and the two sides of any drainage groove correspond to the two drainage mechanisms; s3, waterproof paint is smeared; according to the construction technology, a good anti-seepage effect can be achieved on the top of the building body; the waterproof coiled material can be protected, and the service life of the waterproof coiled material is prolonged; according to the structure, accumulation of water at the top of the building can be reduced, the situation that drainage is not smooth due to small sundries or muddy water mixtures at the top of the building body can be reduced, rapid drainage is facilitated, the anti-seepage effect of the top of the building body is further improved, the using effect is excellent, and high practicability is achieved.
本发明涉及一种建筑物防渗施工工艺,包括以下步骤:S1,安装排水机构,在建筑物本体的顶部两侧安装多个排水机构,排水机构包括第一排水管、连接筒和第二排水管;S2,浇筑第一防水基层,在建筑物本体的顶部浇筑第一防水基层,并在第一防水基层设有多个排水凹槽,且任一排水凹槽的两侧均与两个排水机构对应;S3,涂抹防水涂料;该施工工艺能够对建筑物本体的顶部起到良好的防渗作用;能够对防水卷材进行防护,并延长防水卷材的使用寿命;能减少建筑物顶部水的堆积,能减少建筑物本体顶部因小块杂物或泥水混合物造成的排水不通畅的情况,有利于其快速排水,进一步的提升建筑物本体顶部的防渗效果,使用效果较为优异,具有较强的实用性。
Building anti-seepage construction process
The building anti-seepage construction technology comprises the following steps that S1, drainage mechanisms are installed, specifically, a plurality of drainage mechanisms are installed on the two sides of the top of a building body, and each drainage mechanism comprises a first drainage pipe, a connecting cylinder and a second drainage pipe; s2, a first waterproof base layer is poured, specifically, the first waterproof base layer is poured on the top of the building body, a plurality of drainage grooves are formed in the first waterproof base layer, and the two sides of any drainage groove correspond to the two drainage mechanisms; s3, waterproof paint is smeared; according to the construction technology, a good anti-seepage effect can be achieved on the top of the building body; the waterproof coiled material can be protected, and the service life of the waterproof coiled material is prolonged; according to the structure, accumulation of water at the top of the building can be reduced, the situation that drainage is not smooth due to small sundries or muddy water mixtures at the top of the building body can be reduced, rapid drainage is facilitated, the anti-seepage effect of the top of the building body is further improved, the using effect is excellent, and high practicability is achieved.
本发明涉及一种建筑物防渗施工工艺,包括以下步骤:S1,安装排水机构,在建筑物本体的顶部两侧安装多个排水机构,排水机构包括第一排水管、连接筒和第二排水管;S2,浇筑第一防水基层,在建筑物本体的顶部浇筑第一防水基层,并在第一防水基层设有多个排水凹槽,且任一排水凹槽的两侧均与两个排水机构对应;S3,涂抹防水涂料;该施工工艺能够对建筑物本体的顶部起到良好的防渗作用;能够对防水卷材进行防护,并延长防水卷材的使用寿命;能减少建筑物顶部水的堆积,能减少建筑物本体顶部因小块杂物或泥水混合物造成的排水不通畅的情况,有利于其快速排水,进一步的提升建筑物本体顶部的防渗效果,使用效果较为优异,具有较强的实用性。
Building anti-seepage construction process
一种建筑物防渗施工工艺
WEI XIAOHUI (Autor:in) / ZHOU XIA (Autor:in) / XIAO YONGLIN (Autor:in)
06.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Building sealing anti-seepage construction technology
Europäisches Patentamt | 2024
|Anti-seepage construction process for connecting geomembrane on single anti-seepage wall
Europäisches Patentamt | 2023
|Anti-seepage structure and anti-seepage construction method
Europäisches Patentamt | 2023
|